requirements . The cost of this effort shall be included in the pay item in <br /> which the work is most closely associated with . <br /> SC-11 . 01 Cost of the Work <br /> SC= 11 . 01 .A. 1 . Delete paragraph GG11 . 01 .A . 1 in its entirety, and insert the following sentences <br /> in its place: <br /> 1 . CONTRACTOR will receive payment for actual costs of direct labor and burden <br /> (see SC-2 . 06 . B) for the additional or unforeseen work. Labor includes foremen <br /> actually engaged in the work, and will not include project supervisory personnel nor <br /> necessary on-site clerical staff, except when the additional or unforeseen work is a <br /> controlling work item and the performance of such controlling work item actually <br /> extends completion of the project due to no fault of the Contractor. Compensation <br /> for project supervisory personnel , but in no case higher than a Project Manager's <br /> position , shall only be for the pro-rata time such supervisory personnel spent on <br /> the contract. In no case shall an officer or director of the Company, nor those <br /> persons who own more than 1 % of the Company, be considered as project <br /> supervisory personnel , direct labor or foremen hereunder. The expenses of <br /> performing Work outside of regular working hours , on Saturday, Sunday, or legal <br /> holidays, shall be included in the above to the extent authorized by OWNER. <br /> SC-13. 03 Test and Inspections <br /> SC- 13 . 03 . B . Delete paragraph GC43. 03. 8 in its entirety, and insert the following sentences in <br /> its place: <br /> for services of n independent i <br /> Be OWNER shall employ and pay o the se ces a epe dent test ng laboratoryto <br /> perform all initial inspections , tests , or approvals required by the Contract Documents <br /> except those inspections , tests , or approvals listed immediately below. Subsequent <br /> inspections , tests , or approvals required after initial failing inspections, tests , or <br /> approvals shall be paid for by the CONTRACTOR by back charge to subsequent <br /> applications for payment. The CONTRACTOR shall arrange , obtain , and pay for the <br /> following inspections , tests , or approvals . <br /> 1 . inspections , tests , or approvals covered by paragraphs 13 . 03 . 0 and 13 . 03 . D <br /> below; <br /> 20 costs incurred in connection with tests or inspections conducted pursuant to <br /> paragraph 13 . 04. 13 shall be paid as provided in said paragraph 13 . 04. 13 ; <br /> 3 * tests otherwise specifically provided in the Contract Documents . <br /> 13. 05 OWNER May Stop the Work <br /> SC- 13. 05 .A. Delete paragraph GC43. 05. A in its entirety and insert the following paragraph in its <br /> place: <br /> A. If the Work is defective , or CONTRACTOR fails to supply sufficient skilled <br /> F <br /> orkers or suitable materials or equipment, or fails to comply , with permit <br /> requirements , or fails to comply with the technical specifications , or fails to <br /> perform the Work in such a way that, the completed Work will conform to the <br /> Contract Documents , OWNER may order CONTRACTOR to stop the Work, or any <br /> portion thereof, until the cause for such order has been eliminated ; however, this <br /> right of OWNER to stop the Work shall not give rise to any duty on the part of <br /> 00800-8 <br /> 00800 - Supplementary Conditions 10-12 rev.doc <br /> 00800 8F:Tublic WorkMENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St (Arcadis)Wdmim0d Documents100800 - Supplementary Conditions 10.12 <br /> rev.doc <br /> I <br />