My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:03:03 PM
Creation date
10/1/2015 5:01:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/18/2012
Control Number
2012-227C
Agenda Item Number
12.I.2
Entity Name
Dickerson Florida Inc.
Subject
Contract Documents and Specifications
66th Avenue Roadway Improvements
Area
SR 60 to North of 49th Street
Project Number
0545 & 0370
Bid Number
2013008
Supplemental fields
SmeadsoftID
11696
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01009 <br /> SPECIAL PROVISIONS <br /> 1 . 1 GENERAL <br /> A. Visits to the construction site may be made by representatives of permitting or <br /> governing bodies . Submit details of all instructions from the above to the ENGINEER <br /> immediately . The Work will not be accepted by the OWNER until final acceptance has <br /> been received from the various Regulatory Agencies having jurisdiction . <br /> Be Furnish sufficient labor, construction equipment and materials , and work such hours , <br /> including night shifts and overtime operations , as may be necessary to insure the <br /> prosecution of the work in accordance with the approved progress schedule . If, in the <br /> opinion of the ENGINEER , the CONTRACTOR falls behind the progress schedule , take <br /> such steps as may be necessary to improve progress , all without additional cost to the <br /> OWNER . The ENGINEER shall be compensated for his overtime services in <br /> accordance with the Supplementary Conditions , SC-6 . 02 . <br /> C . All salvageable material and equipment for which specific use , relocation or other <br /> disposal is not specifically noted , shall remain the property of the OWNER and shall be <br /> delivered to the OWNER at the following location : 4550 41 st Street, at the <br /> CONTRACTOR' s expense . All material and equipment not in salvageable condition , as <br /> determined by the ENGINEER and the OWNER , shall be disposed of by the <br /> CONTRACTOR , at the CONTRACTOR's expense . <br /> D . In addition to these Specifications all work must comply with the requirements of the <br /> local governing agency , St . Johns River Water Management District , Department of <br /> Environmental Protection , Army Corps of Engineers , Indian River Farms Water Control <br /> District , and all other applicable State or Federal agencies ' specifications and permits . <br /> In the event of a conflict, the more stringent specification or requirement shall govern . <br /> E . Before performing any work outside the designated limits of the work site , secure any <br /> necessary permits and authorization from the applicable owner, or verify in writing that <br /> such has been previously obtained . Follow all requirements of any said permits or <br /> authorization . Give the ENGINEER and appropriate owner ten ( 10) days minimum <br /> notice before commencing construction operations outside the designated limits of the <br /> work site . <br /> 01009- 1 01009-Special Provisions <br /> FAIDublic Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St (Arcadis)\Admim\Bid Documents\01009 as Special Provisions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.