Laserfiche WebLink
B . The CONTRACTOR shall carefully preserve all control stakes , benchmarks , <br /> reference points and property corners and will be responsible for any mistake <br /> or loss of time caused by their unnecessary loss or disturbance . If the loss or <br /> disturbance of the stakes or marks cause a delay in the Work , the <br /> CONTRACTOR shall have no claim for damages or extension of time . Control <br /> stakes , benchmarks , reference points and property corners disturbed by the <br /> CONTRACTOR's work shall be replaced by a Florida Registered Land Sur- <br /> veyor and Mapper, at the CONTRACTOR's expense . In the event the Owner <br /> must provide the services of the Florida Registered Surveyor and Mapper to <br /> perform this replacement work , the cost of the surveying services will be <br /> deducted from any sums due the CONTRACTOR for the work performed under <br /> this Contract . <br /> C . All survey work shall be performed under the guidance and direction of a <br /> Florida Registered Surveyor and Mapper. <br /> D . All survey work for Record Drawings shall be performed by a Florida Registered <br /> Surveyor and Mapper. <br /> 1 . 3 STATION BOARDS <br /> A . CONTRACTOR shall erect and maintain white/black standard FDOT station <br /> markers every 100 feet . <br /> 1 .4 LAYOUT OF STRIPING <br /> Establish by instrument , and mark the finished surface , the points necessary for <br /> striping finished roadway in conformance with Section 5J of FDOT Standard <br /> Specifications . <br /> 1 . 5 PAYMENT <br /> Include the cost of performing layout work as described above in Contract unit <br /> prices for the various items of work that require layout. <br /> + + END OF SECTION + + <br /> 1050-2 01050 Field Engineering <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St (Arcadis)\Admim\Bid Documents\01050 - <br /> Field Engineering.doc <br /> i <br />