My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:03:03 PM
Creation date
10/1/2015 5:01:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/18/2012
Control Number
2012-227C
Agenda Item Number
12.I.2
Entity Name
Dickerson Florida Inc.
Subject
Contract Documents and Specifications
66th Avenue Roadway Improvements
Area
SR 60 to North of 49th Street
Project Number
0545 & 0370
Bid Number
2013008
Supplemental fields
SmeadsoftID
11696
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
01340 — Submittal of Shop Drawings <br /> 1 . 5 CONTRACTOR'S RESPONSIBILITIES FOR SUBMITTAL OF SHOP <br /> DRAWINGS PRODUCT DATA AND SAMPLES <br /> A . The CONTRACTOR's responsibilities for submittal of shop drawings , <br /> product data , and samples are set forth in paragraph 6 . 17 of the General <br /> Conditions and as further explained herein . <br /> Be Prior to submission , thoroughly check shop drawings , product data , and <br /> samples for completeness and for compliance with the Contract <br /> Documents , verify all dimensions and field conditions , and coordinate the <br /> shop drawings with the requirements for other related work. Also review <br /> each shop drawing before submitting it to the ENGINEER to determine <br /> that it is acceptable in terms of the means , methods , techniques , <br /> sequences and operations of construction , safety precautions and <br /> programs incidental thereto , all of which are the CONTRACTOR's <br /> responsibility. <br /> 1 . It is CONTRACTOR'S responsibility to review submittals made by <br /> his suppliers and Subcontractors before transmitting them to <br /> ENGINEER to assure proper coordination of the Work and to <br /> determine that each submittal is in accordance with its desires and <br /> that there is sufficient information about materials and equipment <br /> for ENGINEER to determine compliance with the Contract <br /> Documents . <br /> 2 . Incomplete or inadequate submittals will be returned for revision <br /> without review. <br /> C . The CONTRACTOR's responsibility for errors and omissions in submittals <br /> is not relieved by the ENGINEER's review of submittals . The <br /> CONTRACTOR shall approve the shop drawings based on his in-the-field <br /> measurements , prior to submittal to the ENGINEER for his review. <br /> D . Notify the ENGINEER , in writing at the time of submission , of deviations in <br /> submittals from the requirements of the Contract Documents . The <br /> CONTRACTOR's responsibility for deviations in submittals from the <br /> requirements of the Contract Documents is not relieved by the <br /> ENGINEER's review of submittals , unless the ENGINEER gives written <br /> acceptance of specific deviations . <br /> E . Begin no work, which requires submittals until return of submittals with the <br /> ENGINEER's stamp and initials or signature indicating the submittal has <br /> been reviewed . <br /> 01340 - Submittal of Shop Drawings.doc <br /> 01340-2 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\054546Th Ave SR60 to 57th St (Arcadis)Wdmim\Bid Documents\01340 - Submittal of Shop <br /> Drawings.doc <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.