My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:03:03 PM
Creation date
10/1/2015 5:01:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/18/2012
Control Number
2012-227C
Agenda Item Number
12.I.2
Entity Name
Dickerson Florida Inc.
Subject
Contract Documents and Specifications
66th Avenue Roadway Improvements
Area
SR 60 to North of 49th Street
Project Number
0545 & 0370
Bid Number
2013008
Supplemental fields
SmeadsoftID
11696
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01520 <br /> CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> 1 . 1 SCOPE <br /> A. Provide all construction equipment and facilities and temporary controls <br /> required to satisfactorily complete the work represented on the Drawings <br /> and described in the Specifications . <br /> 1 . 2 RESPONSIBILITY <br /> A. All construction facilities and temporary controls remain the property of the <br /> Contractor establishing them and shall be maintained in a safe and useful <br /> condition until removed from the construction site . <br /> Be All false work , scaffolding , ladders , hoistways , braces , pumps , roadways , <br /> sheeting , forms , barricades , drains; flumes , and the like , any of which may <br /> be needed in construction of any part of the work and which are not herein <br /> described or specified in detail , must be furnished , maintained and <br /> removed by the CONTRACTOR , who is responsible for the safety and <br /> efficiency of such work and for any damage that may result from their <br /> failure or from their improper construction , maintenance or operation . <br /> C . In accepting the Contract, the CONTRACTOR assumes full responsibility <br /> for the sufficiency and safety of all hoists , cranes , temporary structures or <br /> work and for any damage which may result from their failure or their <br /> improper construction , maintenance or operation and will indemnify and <br /> save harmless the OWNER and ENGINEER from all claims , suits or <br /> actions and damages or costs of every description arising by reason of <br /> failure to comply with the above provision . <br /> 1 . 3 TEMPORARY UTILITIES AND SERVICES <br /> A. TEMPORARY WATER <br /> 1 . Provide a temporary water service as required for all construction <br /> purposes and pay for all water used . <br /> 2 . Furnish potable drinking water in suitable dispensers and with cups <br /> for use of all employees at the job . <br /> 3 . Provide all temporary piping , hoses , etc. , required to transport <br /> water to the point of usage by all trades . <br /> 4 . When temporary water service is no longer required , remove all <br /> temporary water lines . <br /> 01520-1 <br /> FAIDublic Works\ENGINEERING DIVISION PROJECTS10545-66Th Ave SR60 to 57th St (Arcadis)Wdmim\Bid Documents\01520 - <br /> Construction Facilities.doc <br /> f <br />
The URL can be used to link to this page
Your browser does not support the video tag.