My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:03:03 PM
Creation date
10/1/2015 5:01:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/18/2012
Control Number
2012-227C
Agenda Item Number
12.I.2
Entity Name
Dickerson Florida Inc.
Subject
Contract Documents and Specifications
66th Avenue Roadway Improvements
Area
SR 60 to North of 49th Street
Project Number
0545 & 0370
Bid Number
2013008
Supplemental fields
SmeadsoftID
11696
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 1 . 3 TREE AND PLANT PROTECTION <br /> A . Protect existing trees , shrubs and plants on or adjacent to the site that are <br /> shown or designated to remain in lace against unnecessary cutting , breaking or <br /> 9 p 9 rY 9 , 9 <br /> skinning of trunk , branches , bark or roots . <br /> Be Do not store or park materials or equipment within the drip line . <br /> Co Install temporary fences or barricades to protect trees and plants in areas <br /> subject to traffic. <br /> D . Fires shall not be permitted under or adjacent to trees and plants . <br /> E . Within the limits of the Work, water trees and plants that are to remain , in order <br /> to maintain their health during construction operations . <br /> F . Cover all exposed roots with burlap and keep it continuously wet . Cover all <br /> exposed roots with earth as soon as possible . Protect root systems from <br /> mechanical damage and damage by erosion , flooding , run-off or noxious <br /> materials in solution . <br /> G . If branches or trunks are damaged , prune branches immediately and protect the <br /> cut or damaged areas with emulsified asphalt compounded specifically for <br /> horticultural use . <br /> H . Remove all damaged trees and plants that die or suffer permanent injury and <br /> replace them with a specimen of equal or better quality. <br /> I . Coordinate Work in this Section with requirements of other sections herein . <br /> 1_4 PROTECTION OF IRRIGATION <br /> The CONTRACTOR shall be responsible for maintaining in good condition all <br /> irrigation systems within the right-of-way and easements , which could be <br /> damaged by construction activities . The CONTRACTOR shall repair any <br /> irrigation systems damaged by construction activities within two (2) days . <br /> Irrigation systems partially within the right-of-way of 66th Avenue and all <br /> intersecting side streets within project limits may be cut off and capped or <br /> connected to same system to maintain functionality. The CONTRACTOR shall <br /> be responsible for maintaining the functionality of the remaining portion of the, <br /> system if it should fall outside of the right-of-way. <br /> 01541 -2 <br /> FAIDublic Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St (Arcadis)\Admim\Bid Documents\01541 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.