Laserfiche WebLink
SECTION 01630 <br /> SUBSTITUTIONS <br /> 1 . 1 GENERAL <br /> A. Requests for review of a substitution shall conform to the requirements of <br /> Article 6 . 05 , "Substitutes and Or-Equals , " of the General Conditions , and shall <br /> contain complete data substantiating compliance of the proposed substitution <br /> with the Contract Documents . <br /> 1 . 2 CONTRACTOR' S OPTIONS <br /> A . For materials or equipment (hereinafter products) specified only by reference <br /> standard , select product meeting that standard by any manufacturer, fabricator, <br /> supplier or distributor (hereinafter manufacturer) . To the maximum extent <br /> possible , provide products of the same generic kind from a single source . <br /> Be For products specified by naming several products or manufacturers , select any <br /> one of the products or manufacturers named which complies with Specifications . <br /> C . For products specified by naming one or more products or manufacturers and <br /> stating "or equivalent, " submit a request for a substitution for any product or <br /> manufacturer which is not specifically named . <br /> D . For products specified by naming only one product or manufacturer and followed <br /> by words indicating that no substitution is permitted , there is no option and no <br /> substitution will be allowed . <br /> E . Where more than one choice is available as a CONTRACTOR' option , select <br /> product which Is compatible with other products already selected or specified . <br /> 1 . 3 SUBSTITUTIONS <br /> A. During a period of 15 days after date of commencement of Contract Time , <br /> ENGINEER will consider written requests from CONTRACTOR for substitution of <br /> products or manufacturers , and construction methods (if specified) . <br /> 1 . After end of specified period , requests will be considered only in case of <br /> unavailability of product or other conditions beyond control of <br /> CONTRACTOR . <br /> Be Submit 5 copies of Request for Substitution . Submit a separate request for each <br /> substitution . In addition to requirements set forth in Article 6 . 05 of General <br /> Conditions , include in the request the following . <br /> 1 . For products 4 or manufacturers : <br /> a . Product identification , including manufacturer's name and address . <br /> b . Manufacturer's literature with product description , performance and <br /> test data , and reference standards . <br /> 01630A 01630 Substitutions <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St (Arcadis)Wdmim\Bid Documents\01630 - <br /> Substitutions.doc <br />