Laserfiche WebLink
COMPLETION OF WORK <br /> Upon Substantial Completion of the Work , deliver Record Drawings/As-Built Drawings <br /> to ENGINEER . Final payment will not be made until satisfactory record documents are <br /> received and approved by ENGINEER . <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 108A — Record Drawings/As- Built Drawings - Lump Sum <br /> Bid Item No . 108-2 — Survey Control (install/Re- Establish) — Lump Sum <br /> Bid Item No . 108-3 — N . P . D . E . S . Permitting — Lump Sum <br /> [The remainder of this page was left blank intentionally] <br /> 01025-16 Technical Specifications <br /> FAIDublic Works\ENGINEERING DIVISION PROJECTS\0545-66Th Ave SR60 to 57th St (Arcadis)\Admim\I3id Documents\Technical <br /> Cnori£r�finnc rinr <br />