My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-227C
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-227C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:03:03 PM
Creation date
10/1/2015 5:01:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/18/2012
Control Number
2012-227C
Agenda Item Number
12.I.2
Entity Name
Dickerson Florida Inc.
Subject
Contract Documents and Specifications
66th Avenue Roadway Improvements
Area
SR 60 to North of 49th Street
Project Number
0545 & 0370
Bid Number
2013008
Supplemental fields
SmeadsoftID
11696
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to any provision of the Local Government Prompt Payment Act . In such event , <br /> payment and retainage provisions shall be governed by the applicable grant <br /> requirements and guidelines . <br /> 6 . 05 Acceptance of Final Payment as Release . <br /> A . The acceptance by the CONTRACTOR of final payment shall be and shall operate <br /> as a release to the OWNER from all claims and all liability to the CONTRACTOR <br /> other than claims in stated amounts as may be specifically excepted by the <br /> CONTRACTOR for all things done or furnished in connection with the work <br /> under this Contract and for every act and neglect of the OWNER and others <br /> relating to or arising out of the work . Any payment , however , final or otherwise , <br /> shall not release the CONTRACTOR or its sureties from any obligations under <br /> the Contract Documents or the Public Construction Bond . <br /> ARTICLE 7 - INDEMNIFICATION <br /> 7 . 01 CONTRACTOR shall indemnify OWNER , ENGINEER , and others in accordance with <br /> paragraph 6 . 20 ( Indemnification) of the General Conditions to the Construction Contract , <br /> ARTICLE 8 - CONTRACTOR' S REPRESENTATIONS <br /> 8 . 01 In order to induce OWNER to enter into this Agreement CONTRACTOR makes the <br /> following representations : <br /> A . CONTRACTOR has examined and carefully studied the Contract Documents and the <br /> other related data identified in the Bidding Documents . <br /> B . CONTRACTOR has visited the Site and become familiar with and is satisfied as to the <br /> general , local , and Site conditions that may affect cost , progress , and performance of the <br /> Work . <br /> C . CONTRACTOR is familiar with and is satisfied as to all federal , state , and local Laws and <br /> Regulations that may affect cost , progress , and performance of the Work . <br /> D . CONTRACTOR has carefully studied all : ( 1 ) reports of explorations and tests of <br /> subsurface conditions at or contiguous to the Site and all drawings of physical conditions <br /> in or relating to existing surface or subsurface structures at or contiguous to the Site <br /> ( except Underground Facilities) which have been identified in the Supplementary <br /> Conditions as provided in paragraph 4 . 02 of the General Conditions and (2) reports and <br /> drawings of a Hazardous Environmental Condition , if any , at the Site which have been <br /> identified in the Supplementary Conditions as provided in paragraph 4 . 06 of the General <br /> Conditions . <br /> E . CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br /> done so) all additional or supplementary examinations , investigations , explorations , tests , <br /> studies , and data concerning conditions (surface , subsurface , and Underground Facilities) <br /> at or contiguous to the Site which may affect cost , progress , or performance of the Work <br /> or which relate to any aspect of the means , methods , techniques , sequences , and <br /> procedures of construction to be employed by CONTRACTOR , including applying the <br /> specific means , methods , techniques , sequences , and procedures of construction , if any, <br /> 00520 - Agreement (Public Works) REV 04-07 ( 10) <br /> 00520 - 5 <br /> C Wocumerns and SetnngslmmClaugnIlMocal SethngstTemporary Internet FdestContent OutlookQ4026I.M00520 - Agreement (Public Works) REV 0447 ( 10) doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.