My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-265
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2016 1:21:41 PM
Creation date
10/1/2015 1:26:43 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
10/19/2010
Control Number
2010-265
Agenda Item Number
12.I.1
Entity Name
Dickerson Florida Inc.
Subject
Contract 53rd Street Roadways Improvements
Area
IRFWCD Lateral H Canal to Indian River Boulevard
Project Number
0107
Bid Number
2011011
Supplemental fields
SmeadsoftID
9118
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
subsurface or physical conditions or performing any <br /> c CONTRACTOR failed to give the <br /> Work in connection therewith (except in an emergency uired b written notice within the time and <br /> as re- <br /> as required y paragraph 6 . 16 .A) , notify OWNER and <br /> ENGINEER in writing about such condition . q Y Paragraph 4 . 03 .A. <br /> CONTRACTOR shall not further disturb such <br /> condition or perform any Work in connection therewith 3 . If OWNER and CONTRACTOR are <br /> ( except as aforesaid ) until receipt of written order to do unable to agree on entitlement to or on the <br /> so . amount or extent, if any, of any adjustment in <br /> the Contract Price or Contract Times , or both , a <br /> B . ENG/NEER 's Review: After receipt of written Claim may be made therefor as provided in <br /> required b paragraph 10 . 05 . However, OWNER <br /> notice as re , <br /> q y paragraph 4 . 03 .A, ENGINEER ENGINEER, and ENGINEER 's Consultants <br /> will promptly review the pertinent condition , determine <br /> shall not be liable to CONTRACTOR for any <br /> the necessity of OWNER 's obtaining additional <br /> claims , costs , losses <br /> exploration or tests with respect thereto , and advise l or damages ( including <br /> but not limited to al <br /> OWNER in writing (with a copy to CONTRACTOR of l fees and charges of <br /> ENGINEER 'S findings and conclusions . ) engineers , architects , attorneys , and other <br /> professionals and all court or arbitration or other <br /> dispute resolution costs ) sustained by <br /> C . Possible Price and Times Adjustments CONTRACTOR on or in connection with any <br /> 1 - The Contract Price or the Contract other project or anticipated project , <br /> Times , or both , will be equitably adjusted to the 4 . 04 Underground Facilities <br /> extent that the existence of such differing <br /> subsurface or physical condition causes an in - A. Shown or indicated: The information and data <br /> crease or decrease in CONTRACTOR 's cost shown or indicated in the Contract Documents with <br /> of, or time required for , performance of the respect to existing Underground Facilities at or <br /> Work; subject, however, to the following : contiguous to the Site is based on information and <br /> data furnished to OWNER or ENGINEER by the <br /> a . such condition must meet any one or owners of such Underground Facilities , including <br /> more of the categories described in para- OWNER, or by others . Unless it is otherwise <br /> graph 4 . 03 .A; and expressly provided in the Supplementary Conditions : <br /> b . with respect to Work that is paid for 1 . OWNER and ENGINEER shall not <br /> on a Unit Price Basis , any adjustment in be responsible for the accuracy or com - <br /> Contract Price will be subject to the <br /> provisions of paragraphs 9 . 08 and 11 . 03 . pleteness of any such information or data ; and <br /> 2 . the cost of all of the following will be <br /> 2 . CONTRACTOR shall not be entitled included in the Contract Price , and CONTRAC - <br /> to any adjustment in the Contract Price or TOR shall have full responsibility for: <br /> Contract Times if: <br /> a . reviewing and checking all such <br /> a . CONTRACTOR knew of the <br /> existence of such conditions at the time information and data , <br /> CONTRACTOR made a final commitment b . locating all Underground Facilities <br /> to OWNER in respect of Contract Price and shown or indicated in the Contract <br /> Contract Times by the submission of a Bid Documents , <br /> or becoming bound under a negotiated <br /> contract; or c . coordination of the Work with the <br /> owners of such Underground Facilities , <br /> b . the existence of such condition could including OWNER , during construction , and <br /> reasonably have been discovered or <br /> revealed as a result of any examination , d . the safety and protection of all such <br /> investigation , exploration , test , or study of Underground Facilities and repairing any <br /> the Site and contiguous areas required by damage thereto resulting from the Work . <br /> the Bidding Requirements or Contract <br /> Documents to be conducted by or for CON - B . Not Shown or Indicated <br /> TRACTOR prior to CONTRACTOR's <br /> making such final commitment; or 1 . If an Underground Facility is <br /> uncovered or revealed at or contiguous to the <br /> 00700 - General Conditions REV 04-07 .doc <br /> F :\Engineering\Capital Projects\0107-53rd St, 58th Ave-US #1 \Contract Documents\00700 - GOeneral Conditions REV 04-07 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.