Laserfiche WebLink
01340 — Submittal of Shop Drawings <br /> B . Prior to submission , thoroughly check shop drawings , product data , and <br /> samples for completeness and for compliance with the Contract <br /> Documents , verify all dimensions and field conditions , and coordinate the <br /> shop drawings with the requirements for other related work . Also review <br /> each shop drawing before submitting it to the ENGINEER to determine <br /> that it is acceptable in terms of the means , methods , techniques , <br /> sequences and operations of construction , safety precautions and <br /> programs incidental thereto , all of which are the CONTRACTOR ' s <br /> responsibility . <br /> 1 . It is CONTRACTOR ' S responsibility to review submittals made by <br /> his suppliers and Subcontractors before transmitting them to <br /> ENGINEER to assure proper coordination of the Work and to <br /> determine that each submittal is in accordance with its desires and <br /> that there is sufficient information about materials and equipment <br /> for ENGINEER to determine compliance with the Contract <br /> Documents . <br /> 2 . Incomplete or inadequate submittals will be returned for revision <br /> without review . <br /> C . The CONTRACTOR Is responsibility for errors and omissions in submittals <br /> is not relieved by the ENGINEER ' s review of submittals . The <br /> CONTRACTOR shall approve the shop drawings based on his in -the-field <br /> measurements , prior to submittal to the ENGINEER for his review . <br /> D . Notify the ENGINEER , in writing at the time of submission , of deviations in <br /> submittals from the requirements of the Contract Documents , The <br /> CONTRACTOR ' s responsibility for deviations in submittals from the <br /> requirements of the Contract Documents is not relieved by the <br /> ENGINEER ' s review of submittals , unless the ENGINEER gives written <br /> acceptance of specific deviations . <br /> E . Begin no work , which requires submittals until return of submittals with the <br /> ENGINEER 's stamp and initials or signature indicating the submittal has <br /> been reviewed . <br /> 1 . 6 SUBMITTAL REQUIREMENTS AND ENGINEER ' S REVIEW FOR SHOP <br /> DRAWINGS , PRODUCT DATA AND SAMPLES <br /> A . Submit to : <br /> Indian River County <br /> Engineering Division <br /> 1801 27th Street <br /> Vero Beach , FL 32960 <br /> B . A letter of transmittal shall accompany each submittal . If data for more <br /> than one Section of the Specifications is submitted , a separate transmittal <br /> letter shall accompany the data submitted for each Section . <br /> 01340 - Submittal of Shop Drawings . doc <br /> 01340-2 <br /> F: \Engineering\Capital Projects\0107-53rd St, 58th Ave-US # 1 \Contract Documents\01340 - Submittal of Shop Drawings . doc <br />