Laserfiche WebLink
I <br /> PAY ITEM FOOTNOTES <br /> A7E-/ INCLUDES ALL ITEMS FOR MAINTENANCE OF TRAFFIC N/HX7( ARE NOT OW 3 INCLUDE ALL <br /> LABOR, MATERIAL AND EOUZMENT NECESSARY FOR THE COMPLETE DEMOLITION AND BE AL <br /> INCLUDED FOR PAYMENT UNDER SEPARATE ITEMS, INCLUDES EX/STNH" STBICT41TE5 lNCWAWIG <br /> ALL PERMITS. <br /> PEDESTRIAN MAINTENANCE OF TRAFFIC IN ACCORDANCE WITH <br /> SECTION DE-B OF THE SPEOFICATIGNS, INCLUDES TEMPORARY PAVEMENT 0120 I INCLUDES <br />OVER-EXCAVATION, SOIL AMENDMENTAND MIXING OF SOLS WITHIN ROADSIDE SVALES AND <br /> MARKINGS & SGMAGEa AND RAISED PAVEMENT MARKERS, INCLUDES STORYWATER DETENTION AREAS <br /> TO ACHIEVE 'THE REGUIREO WWMUY PERMEABIUTY RATES. INCLUDES SOL <br /> PREPARATAAY ( DETNLEO YANTENANCE AND PROTECTION OF TRAFfC SAMPLING AND TESTING <br /> TO DETERMINE THE APPROPRIATE MATERIALS REWIRED TO ACHIEVE THE REGU1R£D <br /> PLANS FFO7 APPRWAL BY FOOT AND INDIAN RIVER COUNTY, PERMEABILITY RATES AND <br /> TESTING TO DEMONSTRATE THAT THE REWIRED PERMEABILITY RATES HAVE BEEN <br /> ACHIEVED UPON COMPLETION OF CONSTRUCT14N, <br /> 1C-1-! MCLUDES LAMINAL fir DISPOSAL FEN O: UBTMG DRAINAGE TER: DRIVEWAYS:6 <br /> PIPES: WS: SIGHS: FENCE: CURBS: CURB S; TRAF ORNEWAYS: OHO / p INCLUDES ALL FfTTlN[S, <br /> ClEAA0UT5. CONNECTORS* PIPE AND FILTER SLX](. <br /> SLABS: ORv* SFOOTINGS: GATES: IDLES: ASPHALT; DEBRIS: GUARDRAIL; <br /> SEPARATOR; MPO ARY C ASPHALT: BASE: RS; AND <br /> CONCRETE: Y O H R I OHO 73 t INCUDES ALL F/TTNVGS, CIfANDIlTS AND CONNECTORS. <br /> TO BE 'S: <br /> TEMPORARY CARE N O TDETOURS; AND AMY OTHER ITEMS OHO 73 5 <br /> SEPAARA7 PAY TEY,MOVED T INCLUDES SPECIFICALLY SWTTI�NS, INCLUDESRED TIME NRC <br /> 1 hVWW [aerate <br /> TRIMMING FOR UTILITY INSTALLATION AND OR RELOCATION AND FOR <br /> paremw B INCL k mdlal selerakrs dJoaw k Type F Wf0 ad <br /> Gunn <br /> STREET LIGHTING. INSTALLATAW, EXISTING DRAINAGE STRICTURES AND Inc f INCLUDES ALL <br /> B'ON4( NECESSARY TO II7BIfY EXISTING pMeTlaOt STIMCTURES INCWONG CUTTING, ORIl11NG AND <br /> PIPES ISE N THE LIMITS OF REMOVAL <br /> AN SHALL REWIRE UNLESS PATCHING OF THE EXIST/NG CONTROL STR,CTURES, WIER <br /> PLATES, BOLTS, NUTS, FASTENERS AND HARDWARE, <br /> OTHERWISE NOTED. INCLUDES REYWAL AND BACKFILL OF EXIST/MG & <br /> TEMPORARY PAVEMENTS AS DIRECTED BY THE EA WEER. IMC 3 hEWW ON ■aft a rated with <br /> !m sklAweler WAIrOf AtruMUrt )MAdlnO AN odtiny, pwkRky. Lolls, <br /> p5� rola, lordware, faAfemrs. Welr ydtes. mtlmmars, and heff/eis, <br /> 008-2 AIS ND <br /> WATER P FOR ON AND ONo <br /> AUL AND ABATEMENT DE R ARC 6 bchdes the ren %W and r05Xatkn a Of <br />erislIng aired HOWS at the Tfl4hm dwalapomnt, htWw o0 fmdotkmw <br /> AND WATER POLLUTION AND ARf T � USED AT LOCATIONS DESX:WATED <br /> ON THE PLANS, OR AS pRE'CTED BY THE ENGINEER, INCLUDES TURNIXTY Wfa, lefdwara, <br /> amvuns, ewdualors, efactrk serike em hmdhoHs rewired to r~a the 14WHnO, mm Aeetkn <br /> BARRIER, SILT FENCE TYPE O & SAILED HAY OR STRAW, INCLUDES far rights &W <br /> be m dlre0d LW the aplreeer, <br /> REPLACEMENT HAY OR STRAW BALES AS DIRECTED BY THE ENGINEER,, - <br /> UTIUTY The WIt 'price told far furnish/nO ad lrutdbtkNovulremllm a <br /> w6tef min Ahaff Inakde. Cul Is rot haVd k, <br /> 20-I ROADWAY* ALL EARDRIVEWAY, [ANA ITEMS. EXCAVATION ANN EMBANKMENT FOR ITEMS Wp/lles <br />a.�ratkn, ewrd/rotkm wuh aW PermitHnO agmcfm, trenafilny rm ln7, dtspaafnO of and r*krkO <br /> rd06 CONSTRI IOINC CANAL DITCH. AND DETENTIONHOPI AREA aavHaae Ll pfmlk +ar orgmkt <br /> mdarlal, dederhp InslWktka of 0100 od dl rtmrasrs /race wires. <br /> CONSTRICTION, ALLUDES' FINAL GRADING R SHAPING AS NECESSARY X(eaes, Trnln>xt <br /> T83'1/'bkmrs. Y/MYO ffCafe YON ' Ya i(/lawwf/dt fRl f�. JPD fi01fb1Q fkCkIQD$. <br /> LINO FINAL RESiOHATIDN,, EXCAVA7RN .O/ANTITIES DO NOT INCLUDE ,vw&vkO Im "my:%Roper <br /> or am ber gmnarad. N*W faf 9MAg Willer pAX yr MyR;�:�a-eiLF' aN otAer gpxNote <br /> DEYWAL OF EXISTING PAVEMENT, PAYMENT FOR THIS 6 INCLUDED OraOerNA. repilF ramoWl. <br /> dfaPwilfkm told f f pT sprf0re per lrMVtA k res- flfN Iadtttwat <br /> UNDER CLEARING SITE. reskf0?kn of gqfgM Yermaenl or gTda m df <br /> 00s_ lrgd. troffk m1w b Jrul. a Im "a Troch <br /> 60-a INCLUDE BITUMINOUS MATERIAL. PRIME COAT AND TACK COAT. AS Y*dfdJ Ad CbepH6Ce. PSI. Bbed. <br />AOd Per GFa1ofIW B0M Conflrobkp slaltnrt ala! R' I N BrdVkAls. TMnlraatof WM- <br /> RNr Orpkd- !INN anpyW prdlhStkn 0tms. k i�tlkCADp /Wmpl �rA1N <br /> NxludAS kwNp far f - k - iikfe yam <br /> 7 u REWIRED. Ceefd/nUes k Nese An prJmrkP Rimrd Ordwtrq!'. The PVC <br /> pogpa aMl ba C=7X74 and ITN lM1P� Mmtl N0 OR B. .UI <br /> 1ANlarlys aw lAflUday qqN Lq par WACO RNor Cots WNty SfOderdr <br /> 44d IyIAWAirlNM 'AV BODY Molars '.. <br /> -T-� olherwim opw is 17 told dOmewc Tho CivOraakr AW oil. CoWrid <br /> k. hrder a f water meter Me ft p- �r <br /> SmA.as ONtsmn 01 Umbras o4grimew tat Ute with she p ar <br /> In AWA_V Nm Wetat eXdn rhe my Ls NS15:OO' <br /> Ter d darn ma a25 U7 for r!a . Ia11kn Fat. rM apu Wrier <br /> ,um Per !Ail a rrw rats of tho Dtydrlola. <br /> ALL Oa25 ALL STRICTURES ARE lE55 TfIAN .d IN DEPTH. UNLESS OTHEMWDE TNs opafas <br />b ON /A r/dt Coit . the ar !n FIN . fasfdp d/q eatlorknRkd the auto F WH MI <br /> SERIES NOTED. ITEM /NCLUOES SAW�XITTlNG AND REMOVAL DE EXISTING .. M {Re hfe a IA <br /> 6.ttstkg Bola /Mrs wk m/ he mewwr .Ry fM mWtar. T tNS.pR dgportf, r TAfVbW 41 <br /> !TENS PIPE: CONCRETE DOLLARS TO JOIN NEW PIPE TO EXIST= PIP£: - rAt of Im proJOCL <br /> Mee FpEP, Qepraib .ly Xaaehd mq. (fie. Con tow r !s' ill b. r e IN /miler <br /> AN ALL LNG OR OGRE ORIl1MK: 70 TIE-IN TO EXISTING AND <br /> SURFACE m am I n www COWSTRLCTRW camsTS OF SUBGRADE PREPARATION. CaWACTING, <br /> EXCAVATIO/, AMD OPTIONAL BASE <br /> AND ALL RED, 00 AS <br /> OF EXISTING WEERo IN AND SURFACES BIA7UP / PER FART HDEX LI N 56, <br /> AS REQUIRED, Gs AS fXRECIND A THE . AGINEER, PLATE, ALL <br /> SID FAIGm YEMECUTTIRG, AND PAS COR AND ED ALUMINUM <br /> PLATE. BASKETS, 006E TURNOUT CONSTRVCT/pM - ASPHALT COAWSTS OF THE <br /> PLACEMENT OF r WNOUM TNCKNESS ASPHALT MCRETE <br /> AND FASTENERS. INCLUDES OOULGATED ALUMINUM DEBRS BMflfS. <br /> 536-I-1 INCLUDES CONTROLLED RELEASE RETURN AND NESTED GUARDRAIL <br /> SURFACE CO <br /> INCLUDES PIPE RAL, MOUNTING COMPONENTS. INSTALLATION, AND BOLT . RSE TYPE SPAS. <br /> . ' <br /> END TREATMENT FOR THBER POST. . . .. .. . <br /> .. . <br /> 575-h/ SMALL BE <br /> INC STAKING GR PEGGIWITH THE GENERAL NG <br /> OF 7flE . <br /> 0006 INCLUDES HYDRANT ASSEMBLY, PIPE, F(MNOS AND VALVES, <br /> Of 40735 MA:WDES ALL FITTMGS. CIEAMXITS AND CONNECTORS r: <br /> 0530 3 J INCLUDES TYPE D-2 GEOTEXTILE UNDER RIP RAP /NUBBLE. <br /> 0125 BOI INCLUDES ALL LABOR, MATERIALS 6 EOAPMENT FOR TYPE X DITCH <br /> 0125 BOE BOTTOM INLETS, INCLUDES G' TUCK CONCRETE MOW. <br /> 0425 BO /INCLUDES SLOPE APRaN/SLLNE PROTECTION 6 ENERGY DISSIPATOR <br /> ea)m9 <br /> 0125 022 INCLUDES FURNISHING I INSTALLING CURB INLET BASKETS BY <br /> SUNTREE TECHNOLOGIES OR EGUAL, <br /> WS <br /> m NO, REVISION. BY . DATE. SCALE . N. T. S. <br /> g R ADDED RDres eF IR a- 12 AmRDNED, SUMMARY OF <br /> QUANTITIES sxEEr. 33 <br /> ;Q_ Mrtment of Public Works DRAAH. B. F . OF <br />, 275 <br /> ARCu . S. , INC. E/�rrineering Division CHECKED. x .0 66 TH AVENUE <br /> PRDJEDTND. ARDS; <br /> "Y • 'Y DATE . 12- 16 -OA <br /> 2081 VISTA <br /> ( 561 )P697B7000&PAX 15611 697-775133A 11 FIELD BOOR N0, SOUTH <br />OF S. R. 60 TO NORTH OF STTH 8T. IRC_JOB_N0. <br />