Laserfiche WebLink
shall not unreasonably withhold or delay such approval . Failure to reply to the <br /> Developer within thirty ( 30) days shall constitute approval . <br /> B . The Developer and the County shall share equally the cost of <br /> construction, design , and engineering of 53rd Street from 58 `h Avenue to the east <br /> property line of Waterway Village ; provided, however, that the County ' s <br /> obligation for the cost of landscaping shall be limited to one-half of $ 100 , 000 . 00 <br /> per mile . The Developer shall fund and install all border landscaping. <br /> C . The Developer shall have no responsibility for the design, <br /> engineering, or construction costs of 53rd Street east of the Developer ' s east <br /> property boundary, or for the bridges across Lateral H and North Relief canals . <br /> D . The Developer' s obligation with respect to 53rd Street, identified in <br /> the Amended and Restated Development Order and otherwise, shall be deemed <br /> satisfied so long as the Developer is in compliance with this Amended <br /> Agreement, and the County shall not withhold any approval or permit because of <br /> the condition of 53rd Street as long as the Developer is in compliance with this <br /> Amended Agreement . <br /> E . At the time the County accepts title or dedication from the <br /> Developer for the 53rd Street right-of-way, the County shall execute a release of <br /> any interest the County has in Murphy Act right-of-way for the existing 53rd <br /> Street located in Sections 21 and 22 , Township 32 , South, Range 39 East, Indian <br /> River County, Florida, including, but not limited to , the reservation of road right- <br /> of-way described in Deed Book 66 Page 35 , Deed Book 67 Page 267 and Deed <br /> Book 60 Page 86 , Public Records of Indian River County, Florida. <br /> F . The construction of 53rd Street as described above will require the <br /> excavation of a lake to receive the drainage from 53rd Street ("the Lake") . The <br /> Developer agrees to dig the Lake, to install the required drainage pipes from 53rd <br /> Street , and to allow 53rd Street to drain into the Lake and thereafter to furnish <br /> appropriate easements to the County for the use, maintenance and replacement of <br /> such piping. The County agrees that the mining activities associated with <br /> extracting and transporting of this fill will not be charged against the limited <br /> duration of the incidental to construction mining permits issued to the Developer <br /> for the development . <br /> G . The Developer agrees to furnish the County fill (not to exceed <br /> 100 , 000 cubic yards) for use by the County in the construction of 53rd Street east <br /> of the Lateral H . Canal . The fill will be at no cost to the County but the County <br /> will be responsible for arranging and paying for the costs of loading and <br /> transporting the fill . The County agrees that the mining activities associated with <br /> extracting and transporting of this fill will not be charged against the limited <br /> duration of the incidental to construction mining permits issued to the Developer <br /> for the development . <br /> RM : 7031940 : 9 <br /> Page 6 of 14 <br />