My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-128
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-128
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2015 9:16:32 AM
Creation date
10/1/2015 5:22:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/09/2013
Control Number
2013-128
Agenda Item Number
8.G.
Entity Name
Donadio and Associates Architects
Subject
Skeet & Trap Facility Improvement Agreement
Area
Indian River County Public Shooting Range
Supplemental fields
SmeadsoftID
11995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(i) Nothing contained in this agreement shall create a contractual relationship with or a cause of <br /> action in favor of a third party against either the COUNTY or the CONSULTANT. <br /> (j ) Execution of this Agreement by the CONSULTANT constitutes a representation that the <br /> CONSULTANT has become familiar with the Project site and the local conditions under which <br /> the Project is to be implemented . <br /> (k) The CONSULTANT will endeavor to comply with all federal, state, and local laws applicable to <br /> this project. The CONSULTANT will endeavor to design the project in such a manner as to be in <br /> conformance with all current applicable federal, state and local laws, including current <br /> accessibility guidelines as of the signing of this Agreement. <br /> (1) The CONSULTANT will prepare all necessary sketches to accompany applications for any <br /> required federal, state, or local permits . <br /> (m) The CONSULTANT shall report the status of this project to the County' s Project Manager upon <br /> request and hold all drawings, calculations and related work open to the inspection of the Project <br /> Manager or his authorized agent at any time, upon reasonable request. <br /> (n) The CONSULTANT, will prepare all permit applications, and will prepare and furnish copies of <br /> the drawings, specifications and contract documents, as required for federal, state and local <br /> agencies from which approval of the project must be obtained. All original documents, tracings <br /> and the like, including items furnished to the CONSULTANT by the COUNTY pursuant to this <br /> Agreement, are and shall remain the property of the COUNTY, and shall be delivered to the <br /> COUNTY upon completion of the work. <br /> (o) The drawings prepared by the CONSULTANT will be of sufficient detail to permit the actual <br /> location of the proposed building improvements on the ground. <br /> (2) CONSULTANTS SCOPE OF WORK AND PRODUCT DELIVERABLES <br /> 1 . The CONSULTANT will perform all necessary civil engineering, architectural, mechanical and <br /> electrical engineering and structural design, environmental engineering and incidental work for the <br /> site and buildings. Based on the preliminary design development documents, final construction <br /> plans and technical specifications and provisions shall be prepared, establishing in detail the <br /> material and systems required for the project, including the incorporation of sustainable building <br /> and site design principles and systems. <br /> 2 . The CONSULTANT shall Design and prepare a complete set of construction plans for the buildings <br /> suitable for obtaining County Site Plan Approval, Building Permits, and other permits required for <br /> the work. The design shall be in accordance with the 2010 Florida Building Code, current Life <br /> Safety Code and all federal, state and local codes. These plans shall include : <br /> (i) Architectural <br /> (ii) Civil <br /> (iii) Structural <br /> (iv) Mechanical <br /> (v) Electrical <br /> (vi) Environmental <br /> Page 4 of 11 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1213-IRC Shooting Range-Skeet & Trap Improvemnts & Hunters Train Bldg\Admim\bW documents\Agreement - RFQ 2012024 Donadio <br />and <br /> Assoc..doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.