EXHIBIT " B "
<br /> ATTACHMENT " F"
<br /> Fee Guide Calculator
<br /> For Architectural and Engineering Services ti
<br /> ti.
<br /> State of Florida, Department of Management Services
<br /> � t
<br /> Version Posted: March 2012
<br /> Project Name:
<br /> CONSTRUCTION COMPLEXITY GROUP - PERCENTAGE
<br /> COST FOR BUILDING A 8 C D E F G
<br /> (Silework Not Included)
<br /> 1 ,457 ,225 9.01 % 8 .29% 8 .62% 7 . 58% 6 .88% 6. 18% 8 .91
<br /> CALCULATED FEE $ 131 , 268 $ 120, 815 $ 125 ,602 $ 110,464 $ 100, 188 $89,999 $1291789
<br /> Instructions : Fill in probable construction cast at left and push enter key.
<br /> GROUP DEFINITIONS:
<br /> "A" - CONSIDERABLY MORE THAN AVERAGE COMPLEXITY: Complex Laboratories, Medical Hospitals, Emergency Management Centers
<br /> "B" - MORE THAN AVERAGE COMPLEXITY: Average Laboratories, Mental Hospitals, Simple Medical Hospitals, Clinics, Court Houses,
<br /> Theatres, Complex University Buildings, Special Purpose Classrooms, Laboratory Classrooms, Libraries, Auditoriums, Museums, Air Terminals,
<br /> Food Service Facilities, Specialized Detention Areas, Detention-Trealment Areas, Residences
<br /> "C " - REPAIRS AND RENOVATIONS: Miscellaneous Repairs and Renovations, Alterations to Office Space or Dormitory Space, Fire Code
<br /> Corrective Work
<br /> "D" - AVERAGE COMPLEXITY: General Office Space, General Teaching Space, Gymnasiums, General Detention Living Facilities, Factory
<br /> Buildings
<br /> "E" - LESS THAN AVERAGE COMPLEXITY: Apartment Buildings, Dormitory Buildings, Service Garages, Stadiums, Repetitive Design Facilities
<br /> Office Buildings With Undefined Interior Space (open for later partitioning), Specialized Parking Structures
<br /> "F"- CONSIDERABLY LESS THAN AVERAGE COMPLEXITY: Warehouses , Parking Garages, Storage facilities
<br /> "G" - BUILDING ENGINEERING SERVICES: Mechanical, Electrical and Structural not exceeding $1 ,000,000 In construction (Not including Site
<br /> Civil
<br /> ADDITIONAL SERVICES & EXPENSES: '
<br /> The following services are considered Additional to Basic Services and are not included within i
<br /> the basic fee represented by the fee guides :
<br /> -Feasibility Studies/ Analysis -LEED Consultation
<br /> -Facility Programming -Graphlc and Signage Design
<br /> -Master Planning -Special Code Reviews including ACHA
<br /> -Soils InvestigationslReports -Detailed Cost Estimates
<br /> -Surveys -TopographidBoundary -Documents Prepared For:
<br /> Vegetationllmprovements/Utilities -Alternate Bids Exceeding Contract Scope
<br /> -Measured Drawings of Existing Facilities -Excessive Change Orders
<br /> -Existing Facilities Analysis -Multiple Construction Contracts
<br /> -Toxic Substance Mitigation Surveys and Consultation -Record DocumentslAs Buills
<br /> -Site Environmental Assessments -Prolonged Construction Contract Administration Services
<br /> -Site DRI, PUD, Site Pian Review andlor Zoning Modifications -Structural Threshold Inspections
<br /> -Traffic Analysis and Traffic Signal Warrant Studies -Prgect Representation During
<br /> -Civil Engineering Design including Construction Beyond Bi-Monthly Administration
<br /> Pavi nglGrading/Utilibes
<br /> lDrainagelStormwater ManagementfEnvirormentai & All Site -Additional Construction Contract
<br /> Permitting Administration Services for Multiple Contracts
<br /> -Existing Site Utility Infrastructure Improvements -Building Commissioning and Training Services
<br /> -Site Lighting Design -Post Occupancy Inspections/ Evaluations
<br /> -Landscape Architectural & Irrigation Design -Rendedngsl Models
<br /> -Specialty Consultants - Substantive Changes to Scope, Size or Complexity
<br /> VolcelData Communications; Electronic/Audio *Owner Requested Changes to Approved Documents
<br /> Visual; Food Service Equipment; Hazardous -Reimbursable Expenses*
<br /> Material; Hospital/Laboratory; Interior Design; Including, but not limited to, reproduction/ printing costs,
<br /> Indoor Air Quality; Quality Control;
<br /> Theater/Acoustical; Security travel expenses and special mail service expenses
<br /> -Life Cycle Cost (R01) and/or Federal DOE Energy Analysis
<br /> ' As defined in the Division of Real Estate Development and Management form of Agreement Between Owner and Architect - Engineer.
<br /> http &, Hfp . state . fl . its/docs/DMSAEFeeGuideCaletilate . asp 6/8/2012
<br />
|