Laserfiche WebLink
EXHIBIT " B " <br /> ATTACHMENT " F" <br /> Fee Guide Calculator <br /> For Architectural and Engineering Services ti <br /> ti. <br /> State of Florida, Department of Management Services <br /> � t <br /> Version Posted: March 2012 <br /> Project Name: <br /> CONSTRUCTION COMPLEXITY GROUP - PERCENTAGE <br /> COST FOR BUILDING A 8 C D E F G <br /> (Silework Not Included) <br /> 1 ,457 ,225 9.01 % 8 .29% 8 .62% 7 . 58% 6 .88% 6. 18% 8 .91 <br /> CALCULATED FEE $ 131 , 268 $ 120, 815 $ 125 ,602 $ 110,464 $ 100, 188 $89,999 $1291789 <br /> Instructions : Fill in probable construction cast at left and push enter key. <br /> GROUP DEFINITIONS: <br /> "A" - CONSIDERABLY MORE THAN AVERAGE COMPLEXITY: Complex Laboratories, Medical Hospitals, Emergency Management Centers <br /> "B" - MORE THAN AVERAGE COMPLEXITY: Average Laboratories, Mental Hospitals, Simple Medical Hospitals, Clinics, Court Houses, <br /> Theatres, Complex University Buildings, Special Purpose Classrooms, Laboratory Classrooms, Libraries, Auditoriums, Museums, Air Terminals, <br /> Food Service Facilities, Specialized Detention Areas, Detention-Trealment Areas, Residences <br /> "C " - REPAIRS AND RENOVATIONS: Miscellaneous Repairs and Renovations, Alterations to Office Space or Dormitory Space, Fire Code <br /> Corrective Work <br /> "D" - AVERAGE COMPLEXITY: General Office Space, General Teaching Space, Gymnasiums, General Detention Living Facilities, Factory <br /> Buildings <br /> "E" - LESS THAN AVERAGE COMPLEXITY: Apartment Buildings, Dormitory Buildings, Service Garages, Stadiums, Repetitive Design Facilities <br /> Office Buildings With Undefined Interior Space (open for later partitioning), Specialized Parking Structures <br /> "F"- CONSIDERABLY LESS THAN AVERAGE COMPLEXITY: Warehouses , Parking Garages, Storage facilities <br /> "G" - BUILDING ENGINEERING SERVICES: Mechanical, Electrical and Structural not exceeding $1 ,000,000 In construction (Not including Site <br /> Civil <br /> ADDITIONAL SERVICES & EXPENSES: ' <br /> The following services are considered Additional to Basic Services and are not included within i <br /> the basic fee represented by the fee guides : <br /> -Feasibility Studies/ Analysis -LEED Consultation <br /> -Facility Programming -Graphlc and Signage Design <br /> -Master Planning -Special Code Reviews including ACHA <br /> -Soils InvestigationslReports -Detailed Cost Estimates <br /> -Surveys -TopographidBoundary -Documents Prepared For: <br /> Vegetationllmprovements/Utilities -Alternate Bids Exceeding Contract Scope <br /> -Measured Drawings of Existing Facilities -Excessive Change Orders <br /> -Existing Facilities Analysis -Multiple Construction Contracts <br /> -Toxic Substance Mitigation Surveys and Consultation -Record DocumentslAs Buills <br /> -Site Environmental Assessments -Prolonged Construction Contract Administration Services <br /> -Site DRI, PUD, Site Pian Review andlor Zoning Modifications -Structural Threshold Inspections <br /> -Traffic Analysis and Traffic Signal Warrant Studies -Prgect Representation During <br /> -Civil Engineering Design including Construction Beyond Bi-Monthly Administration <br /> Pavi nglGrading/Utilibes <br /> lDrainagelStormwater ManagementfEnvirormentai & All Site -Additional Construction Contract <br /> Permitting Administration Services for Multiple Contracts <br /> -Existing Site Utility Infrastructure Improvements -Building Commissioning and Training Services <br /> -Site Lighting Design -Post Occupancy Inspections/ Evaluations <br /> -Landscape Architectural & Irrigation Design -Rendedngsl Models <br /> -Specialty Consultants - Substantive Changes to Scope, Size or Complexity <br /> VolcelData Communications; Electronic/Audio *Owner Requested Changes to Approved Documents <br /> Visual; Food Service Equipment; Hazardous -Reimbursable Expenses* <br /> Material; Hospital/Laboratory; Interior Design; Including, but not limited to, reproduction/ printing costs, <br /> Indoor Air Quality; Quality Control; <br /> Theater/Acoustical; Security travel expenses and special mail service expenses <br /> -Life Cycle Cost (R01) and/or Federal DOE Energy Analysis <br /> ' As defined in the Division of Real Estate Development and Management form of Agreement Between Owner and Architect - Engineer. <br /> http &, Hfp . state . fl . its/docs/DMSAEFeeGuideCaletilate . asp 6/8/2012 <br />