Laserfiche WebLink
Projected Scope and Budget <br />Construction Materials Testing and Inspection <br />CR 512 Resurfacing Project <br />Indian River County, Florida <br />Attachment A <br />Project Name: <br />Client: <br />Ounkelberger Project#: <br />Date: <br />CR 512 Resurfacing IRC Project #1132 <br />Indian River County Attn: Mr. Christopher J. Kafer, P. E. <br />ASL- 09 - 3054 (BG 14.1) <br />May 17, 2013 <br />Ounkelberger Engineering & Testing, Inc. <br />607 NW Commodity Cove <br />Port St. Lucie, Florida 34986 <br />(772) 343-9787 FAX (772) 343-9404 <br />Contact: Xiaoyan (Sue) Zheng, P. E., PhD <br />Contract <br />Remainin <br />on Contract <br />Itemized ServicesAmountAmount <br />Field Sampling and Testing <br />Sr. Engineering Technician` <br />(includes In-place density testing) <br />Laboratory Testing" <br />Maximum Density (T-180 [Proctor test]) <br />Full Sieve Analysis (T-27) <br />Asphalt Plant Testing <br />FDOT CTAP certified plant Inspector <br />Engineering & Reporting <br />Project Engineer <br />250 hour $55.00 $13,750.00 488 $g 8g $ $8:09 889 $8:88 250 <br />$13,750.00 <br />18 each $86.00 $1,548.00 8 $8:89 8$888 8 $499 18 <br />$1,548.00 <br />18 each $65.00 $1,170.00 8 $0.00 9 $8:88 9 $9:99 18 <br />$1,170.00 <br />40 hour $55.00 $2,200.00 489 60.00 8 $8-89 8.99 $9.89 40 <br />$2,200.00 <br />40 hour $95.00 $3,800.00 9 $0.00 8 $499 8 $9:89 40 <br />$3,800.00 <br />Perform sampling and testing, and construction inspection of FDR and AC, assume 15 days of FDR and 10 days of paving @ 10 hrslday <br />he maximum density testing involves the laboratory density determination of the field -prepared FDR mixture with emulsions. <br />Estimated Total <br />$22,468.00 1 <br />$0:88 1 1 $0:89 I <br />I O. -W 1 <br />$22,468.00 <br />3054 (14.1).CR 512 QA with field inspecdon.x]s <br />