My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-073
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-073
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2015 12:04:40 PM
Creation date
10/1/2015 5:14:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/09/2013
Control Number
2013-073
Agenda Item Number
12.I.1
Entity Name
Ecological Associates, Inc.
Subject
Sector 3 Dune Restoration Project Phase 1 Phase 2, and Phase 3
2013 Post Construction Biological Monitoring
Work Order No. 1
Area
Sector 3
Project Number
13-339
Supplemental fields
SmeadsoftID
11853
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br /> EXHIBIT A <br /> ECOLOGICAL ASSOCIATES, INC. <br /> P.O. BOX 405 <br /> JENSEN BEACH, FLORIDA 34958 <br /> SCOPE OF WORK <br /> 1 ) Project Boundaries. The area to be monitored (Project Area) extends from R-20 <br /> south to R-68 in Indian River County (Sector 3 ). This includes three separate <br /> project phases ( 1 , 2 , and 2B), as well as a control beach. Phase 1 (R36 -R55 ) was <br /> constructed in 2010, Phase 2 (R26 .4 -R36) was constructed in 2011 , and Phase 213 <br /> (R20-R26 .4) was completed prior to the 2012 nesting season . The control beach, <br /> immediately south of the Sector 3 Project Area, will extend from R55 to R60 . <br /> 2) Monitoring Period Post-construction monitoring activities will commence <br /> March 1 , 2013 and will continue through approximately February 2014 , as <br /> stipulated below. <br /> 3 ) Lighting Evaluations (BO Condition No. 11). A single pre-season nighttime <br /> lighting evaluation will be conducted in Phase 1 , Phase 2 , and Phase 2B segments <br /> of the Sector 3 Project Area. Standard protocol will be utilized to evaluate all <br /> exterior lights visible from the beach within each phase . Problematic lights will <br /> be identified on standard field forms provided to the County along with <br /> recommendations for remedial measures . It shall be the responsibility of Indian <br /> River County to document and report any remedial andlor enforcement actions <br /> taken by the County in response to lighting violations reported by EAI. <br /> 4) Weekly Post-construction Scarp Monitoring (FDEP Special Condition No. 24). <br /> Escarpment (scarp) surveys will be conducted on a weekly basis from March I <br /> through September 30 in all three phases of the Sector 3 Project Area. In <br /> accordance with FWC protocol, scarps will be functionally defined as an abrupt <br /> change in beach slope (greater than 45 °) that is at least 18 inches in height and <br /> persists for a distance of 100 feet or more . The location of both the northern and <br /> southern terminus of each scarp will be recorded by GPS and average scarp height <br /> assigned to one of three categories (0 to 2 feet, 2 to 4 feet, and 4 feet or higher). <br /> Additionally, the maximum height of each scarp will be measured. The location <br /> (relative to R monuments), approximate length, height category, maximum height, <br /> and percentage of beach scarped will be presented in tabular and/or graphic format <br /> for reporting purposes. <br /> EAI will notify the County of any persistent scarps within the Project -Area that <br /> may interfere with sea turtle nesting. The County shall be responsible for <br /> notifying FDEP of the presence of those scarps and for coordinating any <br /> remediation measures, if required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.