B . OWNER pay--#ar--tie
<br /> services- a^ independent testtrig_-4aFy __4e B . If ENGINEER considers it necessary or
<br /> perform all iRspoctions _tes . -by advisable that covered Work be observed by ENGI -
<br /> NEER or inspected or tested by others , CONTRAC -
<br /> TOR , at ENGINEER ' s request , shall uncover, expose ,
<br /> 4— is or otherwise make available for observation , inspec-
<br /> novered by paragraphs 13 . 0- 31G. an --1-3:8 .8 tion , or testing as ENGINEER may require , that
<br /> below ; portion of the Work in question , furnishing all neces-
<br /> sary labor, material , and equipment. If it is found that
<br /> � . that sorts ,c;;+'r� „ tseeeeotior�witi such Work is defective , CONTRACTOR shall pay all
<br /> Claims , costs , losses , and damages ( including but not
<br /> paragraph 13 . 04 . 13 shall be paid as-prevfded-+f4 limited to all fees and charges of engineers , architects ,
<br /> said paragraph 13 . 04 . 13 ; attorneys , and other professionals and all court or
<br /> arbitration or other dispute resolution costs ) arising out
<br /> ided-+n of or relating to such uncovering , exposure , observa-
<br /> the raa +rac+ Do..eilmen_ 6; tion , inspection , and testing , and of satisfactory
<br /> replacement or reconstruction ( including but not
<br /> C . If Laws or Regulations of any public body limited to all costs of repair or replacement of
<br />work of
<br /> having jurisdiction require any Work ( or part thereof) others) ; and OWNER shall be entitled to an
<br /> specifically to be inspected , tested , or approved by an appropriate decrease in the Contract Price .
<br /> If the
<br /> employee or other representative of such public body , parties are unable to agree as to the amount thereof,
<br /> CONTRACTOR shall assume full responsibility for OWNER may make a Claim therefor as provided in
<br /> arranging and obtaining such inspections , tests , or paragraph 10 . 05 . If, however, such Work is not found
<br /> approvals , pay all costs in connection therewith , and to be defective , CONTRACTOR shall be allowed
<br /> an
<br /> furnish ENGINEER the required certificates of inspec- increase in the Contract Price or an extension of the
<br /> tion or approval . Contract Times ( or Milestones) , or both , directly
<br /> attributable to such uncovering , exposure ,
<br /> D . CONTRACTOR shall be responsible for observation , inspection , testing , replacement, and
<br /> arranging and obtaining and shall pay all costs in reconstruction . If the parties are unable to agree as to
<br /> connection with any inspections , tests , or approvals the amount or extent thereof, CONTRACTOR may
<br /> required for OWNER ' s and ENGINEER ' s acceptance make a Claim therefor as provided in paragraph
<br /> of materials or equipment to be incorporated in the 10 . 05 .
<br /> Work ; or acceptance of materials , mix designs , or
<br /> equipment submitted for approval prior to 13 . 05 OWNER May Stop the Work
<br /> CONTRACTOR ' s purchase thereof for incorporation
<br /> in the Work . Such inspections , tests , or approvals A. If the Work is defective , or ' ONTR4
<br /> (�TOR
<br /> shall be performed by organizations acceptable to flstosupply suffGient skilled workers ori
<br /> OWNER and ENGINEER .
<br /> E . If any Work (or the work of others) that is to
<br /> be inspected , tested , or approved is covered by CONTRACTOR te step the Work , er any peFtion there
<br /> -
<br /> TRACTOR without written concurrence of ENGk until the ase for h Ardpr has been limonated
<br /> NEER , it must , if requested by ENGINEER , be uncov- A
<br /> ered for observation . not gave rise. tO @Ry duty on the part ef OWNER te
<br /> f xerGise this Fight for the benefit f CONTRACTOR ,
<br /> F . Uncovering Work as provided in paragraph
<br /> 13 . 03 . E shall be at CONTRACTOR ' s expense unlessor OF any 66117ety ,
<br /> CONTRACTOR has given ENGINEER timely notice amthem-
<br /> of CONTRACTOR ' s intention to cover the same and
<br /> ENGINEER has not acted with reasonable prompt-
<br /> ness in response to such notice .
<br /> 13 . 04 Uncovering Work
<br /> A. If any Work is covered contrary to the written
<br /> request of ENGINEER , it must, if requested by ENGI -
<br /> NEER , be uncovered for ENGINEER 's observation
<br /> and replaced at CONTRACTOR ' s expense .
<br /> 00700 - General Conditions REV 04-07 . doc
<br /> 00700 - 36
<br /> F .\Public Works\ENGINEERING DIVISION PROJECTSM47-2 IRC Fairgrounds Overflow 8 Vehicular Staging Phase 2\Admim\bid documents\00700 - General Conditions
<br /> REV 04-07. doc