My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-021B
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-021B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 1:23:01 PM
Creation date
10/1/2015 4:09:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/14/2012
Control Number
2012-021B
Agenda Item Number
8.E.
Entity Name
Mancil Tractor Services
Subject
Contract Documents and Specifications Overflow and Vehicular Staging
Fairgrounds Events
Area
Indian River Fairgrounds Phase 2
Project Number
1047-2
Bid Number
2012028
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10979
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01520 <br /> CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> B . TEMPORARY SANITARY FACILITIES <br /> 1 . Provide temporary toilet facilities separate from the job office . <br /> Maintain these during the entire period of construction under this <br /> Contract for the use of all construction personnel on the job . <br /> Provide enough chemical toilets to conveniently serve the needs of <br /> all personnel . Properly seclude toilet facilities from public <br /> observation . <br /> 2 . Chemical toilets and their maintenance shall meet the requirements <br /> of State and local health regulations and ordinances . Immediately <br /> correct any facilities or maintenance methods failing to meet these <br /> requirements . Upon completion of work , remove the facilities from <br /> the premises . <br /> 1 . 4 SECURITY <br /> Full time watchmen will not be specifically required as a part of the Contract , but <br /> the CONTRACTOR shall provide inspection of work area daily and shall take <br /> whatever measures are necessary to protect the safety of the public , workmen , <br /> and materials , and provide for the security of the site , both day and night . <br /> 1 . 5 TEMPORARY CONTROLS <br /> Take all necessary precautions to control dust and mud associated with the work <br /> of this Contract . In dry weather , spray dusty areas daily with water in order to <br /> control dust . Take necessary steps to prevent the tracking of mud onto adjacent <br /> streets and highways . <br /> 1 . 6 REMOVAL OF TEMPORARY CONSTRUCTION FACILITIES <br /> Remove the various temporary facilities , services , and controls and legally <br /> dispose of them as soon as the work is complete . The areas of the site used for <br /> temporary facilities shall be properly reconditioned and restored to a condition <br /> acceptable to the OWNER . <br /> + + END OF SECTION + + <br /> 01520 -2 <br /> F : \Public Works\ENGINEERING DIVISION PROJECTS\1047-2 IRC Fairgrounds Overflow & Vehicular Staging Phase 2Mrnim \bid <br /> documents\01520 - Construction Facilities . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.