My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-021B
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-021B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 1:23:01 PM
Creation date
10/1/2015 4:09:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/14/2012
Control Number
2012-021B
Agenda Item Number
8.E.
Entity Name
Mancil Tractor Services
Subject
Contract Documents and Specifications Overflow and Vehicular Staging
Fairgrounds Events
Area
Indian River Fairgrounds Phase 2
Project Number
1047-2
Bid Number
2012028
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10979
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> B . Information shown on the Drawings as to the location of existing utilities has <br /> been prepared from the most reliable data available to the Engineer . This <br /> information is not guaranteed , however, and it shall be this CONTRACTOR ' s <br /> responsibility to determine the location , character and depth of any existing <br /> utilities . He shall assist the utility companies , by every means possible to <br /> determine said locations . Extreme caution shall be exercised to eliminate any <br /> possibility of any damage to utilities resulting from his activities . <br /> 1 . 7 ADJUSTMENTS OF UTILITY CASTINGS COVERS AND BOXES <br /> A . All existing utility castings , including valve boxes , junction boxes , manholes , pull <br /> boxes , inlets and similar structures in the areas of construction that are to <br /> remain in service shall be adjusted by the CONTRACTOR to bring them flush <br /> with the surface of the finished work . <br /> B . The CONTRACTOR shall coordinate the utilities to ensure proper construction <br /> sequencing . CONTRACTOR shall make available survey reference markers to <br /> the various utility companies . <br /> + + END OF SECTION + + <br /> 01541 - 5 F : \ PublicWorks\ENGINEERING DIVISION <br /> PROJECTS \ 1047 -2 IRC Fairgrounds Overflow & Vehicular Staging Phase 2Wdmim \ bid documents\01541 - <br /> Protection of Property . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.