My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-021B
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-021B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 1:23:01 PM
Creation date
10/1/2015 4:09:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/14/2012
Control Number
2012-021B
Agenda Item Number
8.E.
Entity Name
Mancil Tractor Services
Subject
Contract Documents and Specifications Overflow and Vehicular Staging
Fairgrounds Events
Area
Indian River Fairgrounds Phase 2
Project Number
1047-2
Bid Number
2012028
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10979
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01630 <br /> SUBSTITUTIONS <br /> 1 . 1 GENERAL <br /> A . Requests for review of a substitution shall conform to the requirements of <br /> Article 6 . 05 , " Substitutes and Or- Equals , " of the General Conditions , and shall <br /> contain complete data substantiating compliance of the proposed substitution <br /> with the Contract Documents , <br /> 1 . 2 CONTRACTOR ' S OPTIONS <br /> A . For materials or equipment ( hereinafter products ) specified only by reference <br /> standard , select product meeting that standard by any manufacturer , fabricator , <br /> supplier or distributor ( hereinafter manufacturer) . To the maximum extent <br /> possible , provide products of the same generic kind from a single source . <br /> B . For products specified by naming several products or manufacturers , select any <br /> one of the products or manufacturers named which complies with Specifications . <br /> C . For products specified by naming one or more products or manufacturers and <br /> stating " or equivalent , " submit a request for a substitution for any product or <br /> manufacturer which is not specifically named . <br /> D . For products specified by naming only one product or manufacturer and followed <br /> by words indicating that no substitution is permitted , there is no option and no <br /> substitution will be allowed . <br /> E . Where more than one choice is available as a CONTRACTOR ' s option , select <br /> product which is compatible with other products already selected or specified . <br /> 1 . 3 SUBSTITUTIONS <br /> A . During a period of 15 days after date of commencement of Contract Time , <br /> ENGINEER will consider written requests from CONTRACTOR for substitution of <br /> products or manufacturers , and construction methods ( if specified ) . <br /> 1 . After end of specified period , requests will be considered only in case of <br /> unavailability of product or other conditions beyond control of <br /> CONTRACTOR . <br /> B . Submit 5 copies of Request for Substitution . Submit a separate request for each <br /> substitution . In addition to requirements set forth in Article 6 . 05 of General <br /> Conditions , include in the request the following : <br /> 1 . For products or manufacturers : <br /> a . Product identification , including manufacturer' s name and address . <br /> b . Manufacturer' s literature with product description , performance and <br /> test data , and reference standards . <br /> 01630 - 1 01630 Substitutions <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS \1047- 2 IRC Fairgrounds Overflow & Vehicular Staging Phase 2\Admim \bid <br /> documents\01630 - Substitutions . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.