My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-021B
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-021B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 1:23:01 PM
Creation date
10/1/2015 4:09:52 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
02/14/2012
Control Number
2012-021B
Agenda Item Number
8.E.
Entity Name
Mancil Tractor Services
Subject
Contract Documents and Specifications Overflow and Vehicular Staging
Fairgrounds Events
Area
Indian River Fairgrounds Phase 2
Project Number
1047-2
Bid Number
2012028
Archived Roll/Disk#
112-R-0001
Supplemental fields
SmeadsoftID
10979
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 . If the substitution requires a more extensive review , Engineer will <br /> proceed with the review only after CONTRACTOR has agreed to <br /> reimburse Owner for the review cost . <br /> 5 . Engineer may require CONTRACTOR to furnish at CONTRACTOR ' s <br /> expense additional data about the proposed substitute . <br /> H . Any redesign of structural members shall be performed by , and the plans signed <br /> and sealed by , a Professional Engineer registered in the State of Florida . The <br /> redesign shall be at the CONTRACTOR ' s expense . Any redesign will require an <br /> extensive review by the Engineer . The CONTRACTOR must agree to reimburse <br /> the Owner for the review cost prior to the Owner' s Engineer proceeding with the <br /> design review . The ENGINEER ' s hourly rate for review is $ 125 per hour . The <br /> ENGINEER ' s estimated cost of review shall be provided to the CONTRACTOR <br /> prior to proceeding with the review to allow the CONTRACTOR the opportunity to <br /> rescind the request . <br /> I . Engineer will be allowed a reasonable time within which to evaluate each <br /> proposed substitution . Engineer will be the sole judge of acceptability and shall <br /> have the right to deny use of any proposed substitution . The CONTRACTOR <br /> shall not order , install , or utilize any substitution without either an executed <br /> Change Order or Engineer ' s notation on the reviewed shop drawing . Owner may <br /> require CONTRACTOR to furnish at CONTRACTOR ' s expense a special <br /> manufacturer' s performance guarantee (s ) or other surety with respect to any <br /> substitute and an indemnification by the CONTRACTOR . ENGINEER will record <br /> time required by Engineer and Engineer' s consultants in evaluating substitutions <br /> proposed by CONTRACTOR and in making changes in the Contract Documents <br /> occasioned thereby . Whether or not a proposed substitute is sued , <br /> CONTRACTOR shall reimburse Owner for the charges of Engineer and <br /> Engineer' s consultants for evaluating each proposed substitute . <br /> J . Substitute materials or equipment may be proposed for acceptance in <br /> accordance with this Section . In the event that substitute materials or equipment <br /> are used and are less costly than the originally specified material or equipment , <br /> than the net difference in cost shall benefit the Owner and CONTRACTOR in <br /> equal proportions . This cost difference shall not be reduced by any failure of the <br /> CONTRACTOR to base his bid on the named materials or equipment . <br /> + + END OF SECTION + + <br /> 01630 - 3 01630 Substitutions <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1047-2 IRC Fairgrounds Overflow & Vehicular Staging Phase 2\Admim\bid <br /> documents \01630 - Substitutions . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.