Laserfiche WebLink
22 . All wetland areas or water bodies that are outside the specific limits of construction <br /> authorized by this permit must be protected from erosion , siltation , scouring or excess <br /> turbidity , and dewatering . <br /> 23 . Prior to construction , the permittee must clearly designate the limits of construction on - site . <br /> The permittee must advise the contractor that any work outside the limits of construction , <br /> including clearing , may be a violation of this permit . <br /> 24 . The operation and maintenance entity shall inspect the stormwater or surface water <br /> management system once within two years after the completion of construction and every <br /> two years thereafter to determine if the system is functioning as designed and permitted . <br /> The operation and maintenance entity must maintain a record of each required inspection , <br /> including the date of the inspection , the name , address , and telephone number of the <br /> inspector, and whether the system was functioning as designed and permitted , and make <br /> such record available for inspection upon request by the District during normal business <br /> hours . If at any time the system is not functioning as designed and permitted , then within <br /> 14 days the entity shall submit an Exceptions Report to the District , on form number 40C - <br /> 42 . 900 (6) , Exceptions Report for Stormwater Management Systems Out of Compliance . <br /> 25 . This project must be constructed and operated in accordance with the plans received by <br /> the District on December 2 , 2011 <br />