My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-222
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-222
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2015 11:01:57 AM
Creation date
10/1/2015 5:52:07 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
11/12/2013
Control Number
2013-222
Agenda Item Number
8.E.
Entity Name
Florida Department of Environmental Protection
Subject
Hurricane Sandy Beach Repair Project Sector 3
DEP Agreement No.141R2
Supplemental fields
SmeadsoftID
12764
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 . 1 Design and Permitting of the Restoration <br /> Coastal Planning and Engineering Inc . has been retained by Indian River County to conduct <br /> professional services to assist the COUNTY with timely negotiation of acceptable FDEP <br /> and USACE permits for the proposed Dune and Berm Repair Project. Specific tasks <br /> associated with these efforts include : FDEP and USACE Permit Negotiations and Data <br /> Monitoring Support coordination services through receipt of Agency action. <br /> Deliverable A : One electronic submission of the final design report. <br /> Deliverable cost: $ 11 ,747 ($5 ,873 — DEP funds). <br /> Due date : July 31 , 2014 . <br /> Deliverable B : One electronic submission of 2013 Sector 3 beach profile monitoring <br /> surveys from Morgan & Eklund, Inc . <br /> Deliverable cost: $ 17,050 ($ 8 ,525 — DEP funds). <br /> Due date : July 31 , 2014 . <br /> Deliverable C : One electronic submission of the pre-application meeting minutes . <br /> Deliverable cost : $5 ,991 ($2 ,995 — DEP funds) . <br /> Due date : July 31 , 2014 . <br /> Deliverable D : One electronic submission of the environmental assessment. <br /> Deliverable cost: $7,594 ($3 ,797— DEP funds) . <br /> Due date : July 31 , 2014 . <br /> Deliverable E : One electronic submission of the permit application. <br /> Deliverable cost: $22 ,598 ($ 11 ,299 — DEP funds) . <br /> Due date : July 31 , 2014 . <br /> Deliverable F : One electronic submission of the RAI responses. <br /> Deliverable cost: $7,967 ($3 ,984 ,— DEP funds). <br /> Due date : July 31 , 2014 . <br /> Deliverable G : One electronic submission of the final construction plans and specifications. <br /> Deliverable cost: $ 12,498 ($6,249 — DEP funds) . <br /> Due date : July 31 , 2014 . <br /> 3.0 Construction <br /> Work performed and costs associated with the placement of fill material and/or the <br /> construction of erosion control structures within the project area. Eligible costs may include <br /> mobilization, demobilization, construction observation or inspection services, beach fill, <br /> tilling and scarp removal, erosion control structures, dune stabilization measures and native <br /> beach-dune vegetation. Construction shall be conducted in accordance with any and all <br /> permits issued by the Department. <br /> Performance Standard : Work products (Deliverables) must meet acceptance standards of <br /> the engineer, building code inspector, Joint Coastal Permit, or a combination of these, as <br /> required, to assure all project-related construction is completed to desired specifications . <br /> Financial Consequence : Any work product that does not meet the Performance Standard <br /> will not be eligible for reimbursement. <br /> DEP Agreement No . 14IR2 , Attachment A, Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.