My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-104
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 1:44:18 PM
Creation date
10/1/2015 4:30:36 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> Scope of Services <br /> FM # 427572 = 1 =58 =01 <br /> This project will be performed for the rehabilitation of the existing pavement section of CR512 <br /> Eastbound lanes from Roseland Road to Easy Street by Cold In - Place Recycling (CIR ) of the existing <br /> materials , and placing a surface course of 2 '/2" Superpave Asphalt . The length of the project is <br /> approximately 1 '/ miles . <br /> The CIR method of construction is to mill the existing asphalt and mix with existing base and subgrade <br /> to make a homogeneous mixture . A small amount of asphalt emulsion is added during the mixing <br /> process . This mixture is graded , compacted , and then surfaced with hot mix asphalt ( Superpave) . <br /> 1 . Signing and markings of the proposed resurfaced eastbound lanes <br /> 2 . Installation of vehicular detector assemblies the following locations" <br /> a . CR- 512 and Barber Street <br /> b . CR-512 and Fleming Street <br /> c . CR- 512 and Easy Street <br /> Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.