My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-196
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-196
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2016 1:57:14 PM
Creation date
10/1/2015 2:51:57 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/06/2011
Control Number
2011-196
Agenda Item Number
8.V.
Entity Name
Florida Department of Transportation
Subject
Widening 66th Avenue SR 60 within state right of way
Construction Agreement
Area
SR60 & 66th Ave.
Supplemental fields
SmeadsoftID
10203
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
850-040.89 <br /> STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION ` C{ IOU / I 1 MAINTENANCE <br /> CONSTRUCTION AGREEMENT 0GC - 06/10 <br /> Page 1 of 4 <br /> co <br /> THIS CONSTRUCTION AGREEMENT (this " Agreement") is made and entered into by and�b✓etween the State <br /> of Florida , Department of Transportation , 3400 West Commercial Blvd . Fort Lauderdale FL . 33309 <br /> ( hereinafter referred to as the " DEPARTMENT") and Indian River Count Board of Count Commissioners <br /> 1801 27th Street , Vero Beach Florida 32960 (hereinafter referred to as the "Construction Coordinator" ) . <br /> WITNESSETH : <br /> WHEREAS , the DEPARTMENT is authorized and required by Section 334 .044( 13) , Florida Statutes , to <br /> coordinate the planning , development, and operation of the State Highway System ; and <br /> WHEREAS , pursuant to Section 339. 282 , Florida Statutes , the DEPARTMENT may contract with a property <br /> owner to finance, construct, and improve public transportation facilities ; and <br /> WHEREAS , the Construction Coordinator proposes to construct certain improvements to <br /> SR 60 Section 88060 Subsection from Begin MP 26 . 872 to End MP <br /> Local Name SR 60 & 66 Avenue located in Indian River County County ( hereinafter <br /> referred to as the " Project" ) ; and <br /> WHEREAS , the parties desire to enter into this Agreement for the Construction Coordinator to make <br /> improvements within the DEPARTMENT'S right of way to construct the Project, which will become the property of the <br /> Department upon acceptance of the work . <br /> NOW, THEREFORE , based on the premises above , and in consideration of the mutual covenants contained <br /> herein , the parties hereby agree that the construction of the Project shall proceed in accordance with the following <br /> terms <br /> and conditions : <br /> 1 . The recitals set forth above are specifically incorporated herein by reference and made a <br /> part of this <br /> Agreement. The Construction Coordinator is authorized , subject to the conditions set forth herein , to enter the <br /> DEPARTMENT'S right of way to perform all activities necessary for the construction of See attached exhibit A scope of <br /> services/special provisions . <br /> 2 . The Project shall be designed and constructed in accordance with the latest edition of the <br /> DEPARTMENT' S Standard Specifications for Road and Bridge Construction and DEPARTMENT Design Standards and <br /> Manual of Uniform Traffic Control Devices (" MUTCD") . The following guidelines shall apply as deemed appropriate by the <br /> DEPARTMENT : the DEPARTMENT Structures Design Manual , AASHTO Guide Specifications for the Design of <br /> Pedestrian Bridges , AASHTO LRFD Bridge Design Specifications , the DEPARTMENT Plans Preparation Manual (" PPM") <br /> Manual for Uniform Minimum Standards for Design , Construction and Maintenance for Streets and Highways (the " Florida <br /> Green Book" ) and the DEPARTMENT Traffic Engineering Manual . The Construction Coordinator will be required <br /> to <br /> submit any construction plans required by the DEPARTMENT for review and approval prior to any work being <br /> commenced . Should any changes to the plans be required during construction of the Project, the Construction <br /> Coordinator shall be required to notify the DEPARTMENT of the changes and receive approval from the DEPARTMENT <br /> prior to the changes being constructed . The Construction Coordinator shall maintain the area of the project at all times <br /> and coordinate any work needs of the DEPARTMENT during construction of the project. <br /> 3 . The Construction Coordinator shall notify the DEPARTMENT a minimum of 48 hours before beginning <br /> construction within DEPARTMENT right of way . The Construction Coordinator shall notify the DEPARTMENT should <br /> construction be suspended for more than 5 working days . <br /> 4 . Pursuant to Section 7- 13 of the DEPARTMENT Standard Specifications , the Construction Coordinator is <br /> required to possess a general liability insurance naming the DEPARTMENT as an additional insured and insuring <br /> the <br /> DEPARTMENT and the Construction Coordinator against any and all claims for injury or damage to persons and property, <br /> and for the loss of life or property that may occur (directly or indirectly) by reason of <br /> the Construction Coordinator <br /> accessing DEPARTMENT right of way and the Construction Coordinator's performance of the Projecand 00/ 100 Such amount <br /> shall be carried in a minimum amount of not less than N/A <br /> Dollars ($ 0 .00 ) for bodily injury or death to any one person or any number of persons in any one <br /> occurrence , and not less than N/A and 001100 Dollars ($ 0 .00 ) <br /> for property damage , or a combined coverage of not less than N/A <br /> and 00/ 100 Dollars ($ 0 .00 ) . Additionally, the Construction Coordinator shall supply the DEPARTMENT <br /> with a payment and performance bond in the amount of the estimated cost of construction , <br /> provided by a surety <br /> authorized to do business in the State of Florida, payable to the DEPARTMENT . The bond and insurance shall remain <br /> in <br /> effect until completeon of as the DEPARTMENTnstruction and ance by the EPARTMENT . Prior to commencement may reasonably <br /> require, f the the the Const u t n Coordinator shall provide on such other occasionsde the <br />
The URL can be used to link to this page
Your browser does not support the video tag.