Laserfiche WebLink
Attachment A ( 2nd Revision ) <br /> Budget and Scope of Work <br /> As a Hazard Mitigation Grant Program project , the Recipient , Indian River County , proposes to <br /> improve the drainage of Rockridge Subdivision located south of 17th Street Bridge between <br /> Indian River Boulevard (facing the Indian River Lagoon) and 6th Avenue , in Vero Beach , Florida . <br /> A Phase I study will be conducted to determine modifications needed to improve and upgrade <br /> the existing drainage system . These improvements include the installation of weirs , titling gates <br /> and jersey barriers installed at the in inlets or overflows in the subdivision . The completed <br /> construction project will provide protection against a 25-year storm event and reduce repetitive <br /> flood loss to properties . Phase I will provide funding for completion of design , permitting and <br /> geotechnical surveying process for this proposal . <br /> The Phase I deliverables should : <br /> • Have an engineer' s plan that clearly shows the engineer' s estimate of the pre and post- <br /> mitigation effects of the proposed project and the relationship of the damages to be <br /> mitigated (commensurate with the level of funding requested ) . This includes , but is not <br /> limited to , the existing and proposed hydrology and hydraulics for the level of event <br /> being mitigated . <br /> • Demonstrate mitigation effectiveness , in part , by showing the physical location (s) and <br /> elevation ( s) of the infrastructure/structures that is being damaged and the Federal <br /> Emergency Management Agency ( FEMA) Special Flood Hazard Areas on the same <br /> plan . <br /> • Meet all required environmental laws and policies . All environmental permits and <br /> approvals/concurrences must be obtained . A public notice must be published to notify <br /> interested parties of the proposed activity . Notices must be published in a manner that <br /> anyone that may be affected or interested in this project has access to the posting . The <br /> comment period expired and all comments addressed prior to initiating any construction <br /> activities . <br /> • Refine the cost estimate . A new Benefit Cost Analysis will be performed using the <br /> revised information . <br /> • Provide a set of Community Approved , State reviewed construction plans (sealed ) for <br /> review and comment including milestones and timelines for completion of the final phase <br /> of the project and bid documents/award . <br /> Phase I of this project is approved with the condition that the above list of deliverables will be <br /> submitted for review and approval by the State and FEMA before Phase II is considered . No <br /> construction work may begin until Phase II is approved . <br /> This is FEMA project 1545-59 -R, funded under 1545- DR . FL . <br />