My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-012A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2015 11:24:20 AM
Creation date
10/1/2015 4:08:24 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
01/24/2012
Control Number
2012-012A
Agenda Item Number
13.A.
Entity Name
Florida Power and Light Company
Subject
Underground electric distribution facilities
Area
Rosedale Substation
Archived Roll/Disk#
112-R-0001
Alternate Name
FPL
Supplemental fields
SmeadsoftID
10976
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
incremental costs of relocation , removal and/or rearrangement of overhead versus underground <br /> facilities . The term "incremental costs " shall mean the difference between the estimated cost that <br /> FPL would incur if the relocation, removal and/or rearrangement were being done with respect to <br /> an overhead line, compared to the estimated cost incurred in relocating , removing and/or <br /> rearranging the underground line . The incremental costs associated with any relocation , removal <br /> and/or rearrangement will be determined and calculated in accordance with FPL ' s approved <br /> tariffs , currently Tariff 6 . 096, Section 10 . 2 . 13 (a) (b) and Tariff 6 . 530 , Section 13 . 2 . 12 (h) . <br /> Overhead and underground installation differential costs per foot of feeder will be determined <br /> utilizing FPL ' s approved Tariff 6 . 530 , Section 13 . 2 . 12 (h) . The cost differential to relocate , <br /> remove and/or rearrange overhead and underground facilities will be determined utilizing FPL ' s <br /> cost estimating system and current costs . The term "incremental costs " shall not include costs <br /> associated with any increase in the size of the underground facilities unless such increase is <br /> requested by the County or an affected FPL Customer or Customers or is the result of <br /> conformance with a new FPL technical standard for the underground facilities (applicable to all <br /> underground facilities) at the time of the relocation, removal and/or rearrangement . Such <br /> conformance does not include an expansion of the underground distribution facilities initiated by <br /> FPL to serve additional FPL Customers or unrelated to a new FPL technical standard for <br /> underground facilities applicable to all underground facilities . <br /> Local Government shall reimburse FPL for all costs to expose , protect or support the <br /> Underground Facilities , whether underground or above ground, in the event of future <br /> construction or excavation , when such services are required by Local Government or other <br /> agency with control over the Local Government ROW or Other ROW . Local Government shall <br /> use its best efforts in any design and construction of its future road improvement projects to <br /> avoid or mitigate the necessity of relocating or adjusting the Underground Facilities in Local <br /> Government ROW and , to the extent reasonably practicable , in Other ROW . <br /> Local Government shall only be responsible for relocation costs associated with <br /> replacement facilities conforming to FPL standards in effect at the time of relocation . Any costs <br /> associated with the replacement facilities to provide increased capacity, improved reliability, <br /> future use facilities , or other such enhancements over and above the FPL standards in effect at <br /> the time of the relocation shall not be the responsibility of Local Government . <br /> Nothing herein shall preclude Local Government from obtaining reimbursement for any <br /> and all costs of requiring FPL to relocate or rearrange any of its Underground Facilities from <br /> those FPL customers to be served by the Underground Facilities or their successors or assigns , or <br /> other entities that initiated the requirement for the relocation or rearrangement of the facilities , <br /> excluding only other agencies which own or have jurisdiction over the ROW . <br /> FPL shall be responsible for any and all costs of removal or relocation when such <br /> removal or relocation is initiated by FPL . Additionally, FPL agrees that when any portion of a <br /> street is excavated by FPL in the location, relocation or repair of any of its facilities when said <br /> location, relocation or repair is initiated by FPL , the portion of the street so excavated shall <br />, <br /> within a reasonable time and as early as practical after such excavation , be replaced by FPL at its <br /> expense in a condition as good as it was at the time of such excavation . <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.