My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-227
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-227
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2016 9:28:47 AM
Creation date
10/1/2015 2:28:39 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
09/21/2010
Control Number
2010-227
Agenda Item Number
8.M.
Entity Name
G.K.Environmental Inc.
Subject
Amendment No. 1 to Work Order No. 1 Oslo Road Boat Ramp
Area
Oslo Road Boat Ramp
Project Number
0381
Supplemental fields
SmeadsoftID
9811
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GK Environmental , Inc. <br /> Oslo Road Boat Ramp <br /> Amendment No . 1 to Work Order No . 1 <br /> September 21 , 2010 BCC Agenda <br /> Page 2 of 5 <br /> that a qualified biologist , such as GKE , complete the submerged resources and <br /> seagrass surveys . <br /> TASK III — Benthic and Fish Surveys <br /> 550 . 00 <br /> PHASE III : Benthic invertebrates and fish sampling will be completed in channel area and adjacent <br /> mosquito control ( ease / west) ditches . Results of these surveys will be presented in <br /> report form . Fish traps , seines , cast & dip nets and sediment coring devise / ponar <br /> grab sample will be used to collect data . Benthic samples will be filtered through sieve <br /> and contents identified . <br /> TASK IV — Revised Mitigation Plan <br /> ( $ 3 , 410 . 00 ) <br /> PHASE IV : CONSULTANT will meet with COUNTY and permit agency staff to discuss mitigation <br /> options and inspect potential mitigation sites for compatibility and prepare a draft <br /> mitigation plan , based upon the ecological values of wetland impacts . <br /> TASK V — Uniform Mitigation Assessment Method ( UMAM ) <br /> ( $ 500 . 00 ) <br /> PHASE V : CONSULTANT will conduct a Uniform Mitigation Assessment Method ( UMAM ) and/or a <br /> Wetland Rapid Assessment Procedure (WRAP ) of the wetlands located within the <br /> boundaries of the project site . UMAM/WRAP determines a numerical value for the <br /> ecological functions and ecological values of the existing wetlands and mitigation site . <br /> The UMAM/WRAP score can be used to determine what type / amount of mitigation will <br /> be required for the project site . The UMAM/WRAP score is based on vegetation , wildlife <br /> usage , hydrology , soils , water quality , success factor, and adjacent property . <br /> TASK VI — Revised Protected Species Survey <br /> ( $ 500 . 00 ) <br /> PHASE VI : CONSULTANT will complete a detailed protected species survey on the referenced <br /> site . CONSULTANT ecologist will conduct a preliminary systematic survey for protected <br /> species in accordance with Florida Fish and Wildlife Conservation Commission <br /> ( FFWCC ) Guidelines . CONSULTANT ecologist will record all observations of listed <br /> protected species and features that may indicate species presence . Physical features <br /> may include , but are not limited to , tree markings , burrows , tracks , nests , scat , and <br /> cavity trees . CONSULTANT will request that the U . S . Fish and Wildlife Service ( FWS) <br /> and the Florida Fish & Wildlife Commission ( FFWCC ) review their files for the presence <br /> of any listed species that may be present onsite . <br /> TASK VII — Revised Vegetation Survey ( FLUCCS ) <br /> ( $ 0 . 00 ) <br /> PHASE VII : CONSULTANT will conduct a systematic survey of vegetation using the Florida Land <br /> Use, Cover and Classification System (FLUCCS) , A Technical Report. FLUCCS was <br /> developed by the State of Florida , Department of Administration , Division of State <br /> Planning , Bureau of Comprehensive Planning , April 1976 . CONSULTANT ecologist <br /> will base the vegetative community descriptions upon field survey observations , SCS <br /> soil maps , and aerial photograph interpretation . <br /> C : \Documents and Settings\jwilliams\Desktop\OBR Amendment No 1 to Work Order No 1 9-2010 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.