Laserfiche WebLink
iCT-14�-2009 WED 05:27 PM Pon FIRTRIC FAX Nr). 7722995167 P. 001 <br />Paragon Electric Of Vero, Inc. <br />9120 1 Qu' PJpce, Vero beach, F1.. 32965 Phone 772••569-8061 Fax 772-209 6107 <br />To: H & D Construction <br />Attu; Tommy Raularson <br />Data: 10/14/2009 6:00 PM <br />Phone: (772) 429.1620 Pages: 2 <br />Fax : (772) 794-7693 <br />Job: Egret Marsh Storm Water Park — Lateral D Pump Station Modifications <br />Quoto: To provide and install electrical wiring to Include: <br />Provide and Install 2 Idema 4X Stainless Steel Pullboxes and WP hubs on bottom <br />side of cantilever blab grid ir►stall aluminum conduits tigtit to concrete. Conduits will be <br />mounted on u/e" Stslnlana Steel unlabout with stainlees steel hardware. Exiating conduita <br />will be removed and new condults will be installed with no cost to owner. <br />The Stair iless Steel pull boxes and WP hubs will be charges as follows. <br />2 <br />24" X <br />24" SS PB and WP Hubs <br />$ <br />3,295.72 <br />1 <br />Labor <br />to Install boxes <br />$ <br />361.36 <br />Total Material and Labor $ 3.657.07 <br />Ploaso rovlow attachod drawing. <br />Approved by Dated <br />File: 101409-1 H&D <br />p,A46E5 1 0 1= 2 <br />