My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-081
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2017 11:53:43 AM
Creation date
10/1/2015 6:08:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/03/2014
Control Number
2014-081
Agenda Item Number
15.B.3
Entity Name
Geosnytec Consultants Inc
Subject
Work Order No. 9
Groundwater monitoring /reporting
Area
Former South Gifford Road Landfill
Supplemental fields
SmeadsoftID
13241
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />23 May 2014 <br />Page 5 <br />Task 6 — IP&T System Dismantling: Under this task, Geosyntec will provide contractor <br />oversight to dismantle and dispose of the IP&T system and system appurtenances. The air <br />stripper will be cleaned and decontaminated. It is anticipated that the concrete will be recycled. <br />Parts of the system that are in reusable condition will be retained for reuse by IRC, if needed <br />(this may include submersible pumps in the recovery wells and/or the air stripper). Recovery <br />wells will be properly abandoned by a Florida -licensed driller. Geosyntec will remove and <br />dispose of above -ground piping/conduit, characterize the waste generated as part of these <br />activities, and oversee waste removal. Overall, the fieldwork is anticipated to require seven man <br />days. Labor hours and related field expenses have been included for this fieldwork, as well as <br />time for contractor procurement and field support. <br />SCHEDULE <br />Geosyntec will conduct the groundwater monitoring and reporting activities on a semi-annual <br />basis as described herein. The semi-annual groundwater monitoring events will be tentatively <br />conducted in June and December 2014. The on -Site P&T system dismantling can be conducted <br />upon authorization from IRC SWDD and based on subcontractor availability. <br />BUDGET ESTIMATE <br />A budget estimate for the scope of work outlined in Tasks 1 through 6 of this proposal is <br />summarized in the following table, and a detailed budget estimate is provided as Attachment A. <br />The budget estimate presented in this proposal is based on Geosyntec's understanding of the <br />project requirements, our experience gained from executing similar tasks for SWDD since 2002 <br />at the Site, and experience with groundwater monitoring and reporting activities at similar <br />facilities. Geosyntec will not exceed the budget estimate without prior approval and written <br />authorization from IRC SWDD. <br />Task 1 — Project Management <br />Task 2 -• Meetings/Regulatory Interaction <br />Task 3 — Annual Pollution Remediation Liabilities Evaluation <br />Task 4 — Semi -Annual Sampling Activities <br />Task 5 , Data Evaluation and Semi -Annual Reporting <br />Task 6 — IP&T System Dismantling <br />TOTAL <br />XR 14096\PR 14027_20140523_REV <br />engineers 1 scientists 1 innovators <br />$6,349 <br />$7,904 <br />$3,656 <br />$56,689 <br />$25,551 <br />$25,932 <br />$126,081 <br />
The URL can be used to link to this page
Your browser does not support the video tag.