My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-006
CBCC
>
Official Documents
>
2010's
>
2014
>
2014-006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2015 10:19:46 AM
Creation date
10/1/2015 5:52:37 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br /> DECEMBER 2013 BUDGET ESTIMATE <br /> SOUTH GIFFORD ROAD LANDFILL <br /> PHASE 2 : Field Activities <br /> ITEM BASIS RATE QUANTITY ESTIMATED <br /> BUDGET <br /> [tGeologist <br /> a ,d4 777 <br /> ne. 5 �; r °ca+ 'Geologist hr $ 176 1 $ 176 <br /> hr $ 126 9 $ 1 , 134 <br /> Subtotal Professional Services $ 1 ,310 <br /> "' Fz m <br /> In I <br /> onstruction Manager hr $ 107 50 $5,350 <br /> Subtotal Technical/Administrative Service $59350 <br /> An Min A 4 <br /> w . in <br /> It I <br /> Well Driller Mob/Demob each $ 17070 1 $ 1 ,070 <br /> Well Installation ft $32 136 $49366 <br /> Well Completion each $ 161 2 $321 <br /> Well development each $ 107 3 $321 <br /> Well Abandonment each $545 2 SLOW <br /> Drums each $54 12 $642 <br /> Per Diem (lodging and food for 3 man crew) each $ 161 2 $321 <br /> Well Permit each $ 107 1 $ 107 <br /> Decon each $ 161 1 $ 161 <br /> Well Survey (3 wells) quote $926 1 $926 <br /> Drum Characterization Sampling (Liquid) each $ 161 1 $ 161 <br /> Drum Characterization Sampling (Solid) each $ 161 1 $ 161 <br /> GAC Characterization Sampling each $ 161 1 $ 161 <br /> GAC Removal and Transport quote $ 13605 1 $ 19605 <br /> Subtotal Subcontractor Service $119410 <br /> . ,, ee <br /> . <br /> In: <br /> ! �. <br /> 1" . , <br /> In <br /> nI <br /> PDBs-Field Ready each $30.50 42 $ 19281 <br /> Lodging day $89 3 $267 <br /> Per Diem day $51 3 $ 153 <br /> Communications Fee 3% labor 0 .03 $63660 $200 <br /> Field Vehicle day $97 3 $291 <br /> 8. 5'x11 " Photocopies each $0 . 12 0 $0 <br /> Well Installation Kit day $ 190 1 $ 190 <br /> Equipment Shipping each $54 1 $54 <br /> Subtotal Reimbursable! $2,436 <br /> # » <br /> Notes: <br /> 1 . Lodging and per diem rates were taken from the GSA website for the Vero Beach area (www.gsa.gov). <br /> 2 . Monitoring Well Installation Kit includes: PID, water level indicator, GPS unit, field geology kit, and multi-meter (pH, temperature, <br /> conductivity, turbidity, dissolved oxygen, and oxidation reduction potential), and miscellaneous supplies. <br /> PR13082-122013.xlsx Geosyntec Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.