Laserfiche WebLink
Mr . Terry Southard <br /> 24 March 2010 <br /> Page 4 <br /> • In advance of purging/sampling of any wells during a sampling event, IRC will have their <br /> subcontractor conduct the required depth to groundwater measurements frorn the <br /> monitoring wells required by the 1~ DEP - approved NAM plan . Water- level measurements <br /> will be used by Geosyntec in conjunction with the existing surveyed well elevations for <br /> continued evaluation of groundwater flow directions . <br /> • Issues identified by Geosyntec associated with the data package provided by IRC of the <br /> field activities and the laboratory results of the groundwater sampling effort will be <br /> addressed by IRC at no cost or effort to Geosyntec . <br /> • Budget has not been included for any additional delineation sampling or monitoring well <br /> installations in the vicinity of monitoring well MW06 . <br /> ESTIMATED BUDGET <br /> A summary of estimated project costs is included in Attachment B . <br /> XR10051 /XR10051 IRC North RO NAM Reporting Proposal . Doc <br /> engit-wers I sC; ie nti. sts I .innovators <br />