My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-127
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-127
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 12:16:47 PM
Creation date
10/1/2015 2:14:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/18/2010
Control Number
2010-127
Agenda Item Number
8.F.
Entity Name
Geosyntec Consultants
Subject
Cumberland Farms Oslo Road Improvements
Work Order No. 27
Area
Oslo Road between 43rd Avenue and 27th Avenue
Supplemental fields
SmeadsoftID
9690
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr . Michael Nixon <br /> 23 March 2010 <br /> Page 4 <br /> Upon receipt of contractor bids , Geosyntec will prepare a turn-key proposal for submittal to IRC <br /> which recommends the lowest qualified bid , and includes Geosyntec costs for performance of all <br /> project environmental sampling, PSSC UST closure/remediation costs, coordination with <br /> Brevard County Natural Resources Management Office , IRC Department of Health , and required <br /> project reporting . <br /> ASSUMPTIONS <br /> During the preparation of this proposal , Geosyntec has made the following assumptions : <br /> • Access to sampling locations is not restricted . <br /> • All sampling can be performed in Level D personal protective equipment. <br /> • Geosyntec will be able to work unimpeded between Monday and Friday from 7 am - 7 pm . <br /> To the greatest extent possible, Geosyntec will minimize disruptions to site operations . <br /> While select soil boring/groundwater sampling locations will be completed in close <br /> proximity to fuel dispensers, it is anticipated that only intermittent closure of select <br /> dispensers will be required to complete the proposed sampling activities . It is anticipated <br /> that the facility will remain open to customers during the performance of the proposed <br /> investigation activities . <br /> • Geosyntec and/or subcontractors will hand auger to a minimum depth of 5 ft BLS in an <br /> effort to confirm the private utility locate . Unmarked utilities that are damaged (following <br /> efforts to locate with a private utility locating company and hand augering) will not be <br /> Geosyntec ' s responsibility . <br /> Geosyntec has assumed that liquids generated .during sampling will be discharged directly <br /> onto the ground adjacent to the monitoring well (for percolation or evaporation) . <br /> • Geosyntec has assumed that the DPT soil and groundwater investigation can be completed in <br /> one day . <br /> XR10109/CCR10024 .DOC <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.