Laserfiche WebLink
Mr . Michael Nixon Geosyntec ° <br /> 22 November 2010 ( 11„11 ) u ' " ” <br /> Page 3 <br /> Task 1 — Preliminary Activities and Proiect Mannement <br /> Task 1 includes project management for the entire project and activities required to implement <br /> the proposed work . Specific activities include ; project planning and management responsibilities <br /> such as correspondence with IRC and IRC Department of Health, Brevard County Natural <br /> Resources , meetings with IRC personnel , subcontracting , invoice review, project coordination , <br /> review of subcontractor required deliverables and project administration . The project <br /> management phase also includes budget for revisions to the OSHA-required Site- Specific Health <br /> and Safety Plan to reflect the proposed excavation work to be conducted at the Site . <br /> Geosyntec prepared bid specifications (which were reviewed by IRC) , drawings , and a schedule <br /> of prices suitable for subcontractor bidding of the petroleum related work. Geosyntec received <br /> price quotes from three subcontractors qualified to perform the scope of services related to the <br /> project scope . A review of the bids revealed a bid of $ 150 ,200 by PR&D , a bid of $ 145 ,497 by <br /> Florida Environmental Compliance Corporation (FECC) , and a bid of $ 89 , 950 by HCC <br /> Environmental Services (HCC) . Based upon follow-up telephone communications with HCC , <br /> regarding the price and schedule , HCC confirmed that they can complete the specific services <br /> outlined in the scope of work for the proposed price . Geosyntec recommends that the low <br /> bidder, HCC , be selected for the project as the petroleum contractor . Bid pricing information <br /> and a copy of the bidding package is included as Attachment C . A detailed breakdown of <br /> estimated project costs is included as Attachment B . <br /> Task 2 — UST Closure/Source Removal Activities <br /> Task 2 includes project activities associated with implementing the UST closure and source <br /> removal activities , including the following : <br /> e install and operate a dewatering system with the objective of lowering the water table to <br /> a minimum of 10 ft below land surface within the proposed excavation areas ; <br /> o set-up and operate dewatering fluids treatment equipment, which will include an air <br /> stripper with treated effluent discharge to the stormwater area in the eastern portion of <br /> the Site ; <br /> XR 10109/CCR 10080 . DOC <br /> engineers I scientists I innovators <br />