My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-303
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 1:14:49 PM
Creation date
10/1/2015 2:36:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
12/07/2010
Control Number
2010-303
Agenda Item Number
8.X.
Entity Name
Geosyntec Consultants
Subject
Cumberland Farms Oslo Road Improvements Phase II
Amendment No.1 to Work Order 27
Area
Oslo Road between 43rd Ave. and 27th Ave.
Supplemental fields
SmeadsoftID
9895
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr . Michael Nixon Geosyntec ° <br /> 22 November 2010 ( 11„11 ) u ' " ” <br /> Page 3 <br /> Task 1 — Preliminary Activities and Proiect Mannement <br /> Task 1 includes project management for the entire project and activities required to implement <br /> the proposed work . Specific activities include ; project planning and management responsibilities <br /> such as correspondence with IRC and IRC Department of Health, Brevard County Natural <br /> Resources , meetings with IRC personnel , subcontracting , invoice review, project coordination , <br /> review of subcontractor required deliverables and project administration . The project <br /> management phase also includes budget for revisions to the OSHA-required Site- Specific Health <br /> and Safety Plan to reflect the proposed excavation work to be conducted at the Site . <br /> Geosyntec prepared bid specifications (which were reviewed by IRC) , drawings , and a schedule <br /> of prices suitable for subcontractor bidding of the petroleum related work. Geosyntec received <br /> price quotes from three subcontractors qualified to perform the scope of services related to the <br /> project scope . A review of the bids revealed a bid of $ 150 ,200 by PR&D , a bid of $ 145 ,497 by <br /> Florida Environmental Compliance Corporation (FECC) , and a bid of $ 89 , 950 by HCC <br /> Environmental Services (HCC) . Based upon follow-up telephone communications with HCC , <br /> regarding the price and schedule , HCC confirmed that they can complete the specific services <br /> outlined in the scope of work for the proposed price . Geosyntec recommends that the low <br /> bidder, HCC , be selected for the project as the petroleum contractor . Bid pricing information <br /> and a copy of the bidding package is included as Attachment C . A detailed breakdown of <br /> estimated project costs is included as Attachment B . <br /> Task 2 — UST Closure/Source Removal Activities <br /> Task 2 includes project activities associated with implementing the UST closure and source <br /> removal activities , including the following : <br /> e install and operate a dewatering system with the objective of lowering the water table to <br /> a minimum of 10 ft below land surface within the proposed excavation areas ; <br /> o set-up and operate dewatering fluids treatment equipment, which will include an air <br /> stripper with treated effluent discharge to the stormwater area in the eastern portion of <br /> the Site ; <br /> XR 10109/CCR 10080 . DOC <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.