My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-303
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-303
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2016 1:14:49 PM
Creation date
10/1/2015 2:36:16 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
12/07/2010
Control Number
2010-303
Agenda Item Number
8.X.
Entity Name
Geosyntec Consultants
Subject
Cumberland Farms Oslo Road Improvements Phase II
Amendment No.1 to Work Order 27
Area
Oslo Road between 43rd Ave. and 27th Ave.
Supplemental fields
SmeadsoftID
9895
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Michael Nixon Geosyntec ° <br /> 22 November 2010 <br /> Page 5 <br /> Task 3 — Reporting <br /> Geosyntec will prepare a Tank Closure/ Source Removal Report in accordance with Chapter 62 - <br /> 761 , Florida Administrative Code (FAC) and FDEP Storage Tank System Closure Requirements . <br /> The report will include photographs documenting the UST closure work and petroleum source <br /> removal activities , laboratory analytical results for collected soil and groundwater samples in <br /> tables and figures , and a detailed summary of the field activities completed at the site . It is <br /> anticipated that the report will include a recommendation for No Further Action (assuming <br /> sampling results do not exceed any cleanup target levels) . The final reports ( four hard copies <br /> and one electronic copy to be provided to IRC) will be signed and sealed by the Florida- licensed <br /> professional engineer in responsible charge of the project . A detailed breakdown of estimated <br /> project costs is included as Attachment B . <br /> ASSUMPTIONS <br /> The following assumptions were made in developing this fee proposal : <br /> • Excavated soil Will be transported to the IRC Class I landfill for disposal as non <br />- <br /> hazardous waste . Costs for soil disposal at the IRC Landfill are the responsibility of IRC . <br /> • IRC staff will sign/execute all waste/soil disposal manifests . <br /> • All site work can be performed in Level D personal protective equipment . <br /> ® Project work can be performed beginning in January 2011 . <br /> • Geosyntec and our subcontractors will be able to work unimpeded seven days per week <br /> between from 7 am - 7 pm . <br /> SCHEDULE <br /> Upon receipt of a signed Work Order for Amendment # 1 from IRC , Geosyntec will immediately <br /> initiate field activities scheduling . Geosyntec anticipates initiating project field work in the <br /> beginning of January 2011 and completing the field activities by the end of January . It is <br /> anticipated that UST Closure and Source Removal Report will be submitted to IRC personnel by <br /> XR 10109/CCR 10080 .DOC <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.