My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-221
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 11:56:27 AM
Creation date
10/1/2015 2:57:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
10/18/2011
Control Number
2011-221
Agenda Item Number
15.B.3
Entity Name
Geosyntec Consultants
Subject
Amendment No.2 to Work Order No. 29
Former Gifford Road Landfill
Area
Gifford Landfill South Gifford Road Plumr
Supplemental fields
SmeadsoftID
10297
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 2 <br /> BUDGET ESTIMATE <br /> SOUTH GIFFORD ROAD LANDFILL <br /> PHASE 2: Iniection and Monitoring Well Installation Activities <br /> ITEM BASIS RATE QUANTITY ESTIMATED <br /> BUDGET <br /> A. Professional Services <br /> a. Principal hr $ 195 . 67 2 $391 <br /> b . Associate hr $ 185 .32 0 $0 <br /> c. Senior Project Geologist hr $ 163 .07 6 $978 <br /> d. Project Engineer hr $ 129 . 12 16 $2 ,066 <br /> e . Engineer hr $ 112 .49 0 $0 <br /> f Senior Staff Geologist hr $ 100 . 16 70 $77011 <br /> g. Staff Engineer hr $84 .24 0 $0 <br /> Subtotal Professional Services $ 10,447 <br /> B. TechniaUAdministrative Services <br /> a. Site Manager/Construction Manager hr $98 . 56 0 $0 <br /> b . Senior Engineering Technician hr $73 . 88 0 $0 <br /> c. Designer/GIS hr $ 119 . 39 0 $0 <br /> d. Drafter/CADD Operator hr $72 . 79 0 $0 <br /> e . Technical/Administrative Assistant hr $81 . 39 4 $326 <br /> f. Technical Word Processor hr $83 .08 0 $0 <br /> g. Clerical hr $49.96 0 $0 <br /> Subtotal Technical/Administrative Services $326 <br /> C. Subcontractor <br /> a. Driller Mod/demob/prep LS $321 . 00 1 $321 <br /> b . DPT Daily Rate day $ 1 ,444 . 50 5 $7 ,223 <br /> c . Per Diem day $214 .00 4 $856 <br /> d. Injection Well Installations each $ 159 . 16 24 $33820 <br /> e. Monitoring Well Installation each $342 .40 1 $342 <br /> f. Well Development hr $ 185 . 00 0 $0 <br /> g. Decon hr $214 .00 0 $0 <br /> h . Permits LS $ 107 .00 1 $ 107 <br /> i . Drums each $58 . 85 0 $0 <br /> j . GPS Unit/Level/Rod for Surveying day $63 .00 1 $63 <br /> Subtotal Subcontractor Services $129732 <br /> D Reimbursables <br /> rdD <br /> ing day $89 4 $356 <br /> iem day $ 51 4 $204 <br /> munications Fee 3 % labor 0 .03 $ 10,772 $323 <br /> D Computer System hr $ 15 4 $60 <br /> icle Rental day $75 5 $375 <br /> x11 " Photocopies each $0 . 12 100 $ 12 <br /> rnight Cooler each $95 0 $0 <br /> undwater Sampling Kit day $275 0 $0 <br /> l Installation Kit week $760 1 $760 <br /> ipment Shipping each $54 2 $ 108 <br /> Subtotal Reimbursables $29198 <br /> TOTAL ESTIMATED BUDGET . PHASE 2 $25,702 <br /> Notes: <br /> 1 . Lodging and per diem rates were taken from the GSA website for the Vero Beach area (www.gsa.gov). <br /> 2 . Well Installation Kit includes: water level indicator, PID/FID OVA, GPS unit, field geology kit, <br /> measuring wheel , multi-meter (pH, temperature, conductivity, turbidity, dissolved oxygen, and oxidation <br /> reduction potential), and miscellaneous supplies. <br /> Geosyntec Consultants <br /> XRI 1072 .xlsx <br />
The URL can be used to link to this page
Your browser does not support the video tag.