My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-221
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-221
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2016 11:56:27 AM
Creation date
10/1/2015 2:57:22 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Second Amendment
Approved Date
10/18/2011
Control Number
2011-221
Agenda Item Number
15.B.3
Entity Name
Geosyntec Consultants
Subject
Amendment No.2 to Work Order No. 29
Former Gifford Road Landfill
Area
Gifford Landfill South Gifford Road Plumr
Supplemental fields
SmeadsoftID
10297
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H . Mehta, P . E . <br /> 30 September 2011 <br /> Page 5 <br /> will be performed at a frequency of semi- annually ( in conjunction with current semi- annual <br /> groundwater sampling at the site) , for a minimum of one sampling event following the performance <br /> of injection activities, and laboratory analyzed for UIC parameters . UIC parameters include total <br /> recoverable petroleum hydrocarbons (TRPH), polysorbate 80 surfactant (by method SM5540-1)) , <br /> sodium , chloride and total dissolved solids ( TDS) . UIC parameter analysis will be performed on <br /> groundwater samples from three monitoring wells, including : ( i) GR-MW3013 in the former source <br /> area; (ii) GR-MW02D located adjacent to and down-gradient of biobarrier transect 1 ; and ( iii) GR- <br /> MW28D located adjacent to and down- gradient of biobarrier transect 3 . Additional sampling will <br /> not be conducted for the referenced parameters if, sample results from the semi-annual event <br /> following the injection activities meet UIC criteria . <br /> It is anticipated that semi- annual CVOC and total organic carbon (TOC ) sampling currently <br /> performed (and contracted) at the site is adequate for performance monitoring of the source area and <br /> biobarriers . This sampling will continue to include semi-annual sampling for TOC in one former <br /> source area monitoring well ( GR- MW3013 ), a monitoring well downgradient of biobarrier transect 1 <br /> (GR-MW021)), and a monitoring well downgradient of biobarrier transect 3 (GR-MW281)) . TOC <br /> concentrations will be evaluated as an indicator of the presence of electron donor. Field parameters <br /> (pH, dissolved oxygen, and oxidation-reduction potential) will continue to be recorded during semi- <br /> annual groundwater sampling activities and will be utilized to evaluate whether the aquifer continues <br /> to be conducive to reductive dechlorination . <br /> It has been assumed that the UIC and performance monitoring will be conducted within the <br /> currently authorized semi-annual groundwater monitoring budget and therefore no additional <br /> budget is included for these activities herein. However, the scope is discussed above to inform the <br /> County about the additional analytical costs that should be expected because the analytical costs are <br /> directly billed to IRC SWDD . <br /> SCHEDULE <br /> FDEP has requested that the County begin implementation of the required activities by 21 <br /> October 2011 . Geosyntec will initiate these activities within two weeks of receipt of notice to <br /> proceed from the County . The final field schedule will be based on subcontractor availability . <br /> We anticipate that the field activities will tentatively be conducted in November and/or <br /> December 2011 . A description of the well installation and dosing activities will be included in <br /> future semi -annual groundwater monitoring report( s) . <br /> BUDGET ESTIMATE <br /> A budget estimate for the scope of work outlined in Phases 1 through 4 of this proposal is <br /> summarized in the following table, and a detailed budget estimate is provided as Exhibit 1 . The <br /> budget estimate presented in this proposal is based on Geosyntec ' s understanding of the project <br /> XR11055\XR11072 <br /> f' nIlf11"we. rs `civrltists innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.