Laserfiche WebLink
Mr. Himanshu H . Mehta, P . E . <br /> 30 September 2011 <br /> Page 5 <br /> will be performed at a frequency of semi- annually ( in conjunction with current semi- annual <br /> groundwater sampling at the site) , for a minimum of one sampling event following the performance <br /> of injection activities, and laboratory analyzed for UIC parameters . UIC parameters include total <br /> recoverable petroleum hydrocarbons (TRPH), polysorbate 80 surfactant (by method SM5540-1)) , <br /> sodium , chloride and total dissolved solids ( TDS) . UIC parameter analysis will be performed on <br /> groundwater samples from three monitoring wells, including : ( i) GR-MW3013 in the former source <br /> area; (ii) GR-MW02D located adjacent to and down-gradient of biobarrier transect 1 ; and ( iii) GR- <br /> MW28D located adjacent to and down- gradient of biobarrier transect 3 . Additional sampling will <br /> not be conducted for the referenced parameters if, sample results from the semi-annual event <br /> following the injection activities meet UIC criteria . <br /> It is anticipated that semi- annual CVOC and total organic carbon (TOC ) sampling currently <br /> performed (and contracted) at the site is adequate for performance monitoring of the source area and <br /> biobarriers . This sampling will continue to include semi-annual sampling for TOC in one former <br /> source area monitoring well ( GR- MW3013 ), a monitoring well downgradient of biobarrier transect 1 <br /> (GR-MW021)), and a monitoring well downgradient of biobarrier transect 3 (GR-MW281)) . TOC <br /> concentrations will be evaluated as an indicator of the presence of electron donor. Field parameters <br /> (pH, dissolved oxygen, and oxidation-reduction potential) will continue to be recorded during semi- <br /> annual groundwater sampling activities and will be utilized to evaluate whether the aquifer continues <br /> to be conducive to reductive dechlorination . <br /> It has been assumed that the UIC and performance monitoring will be conducted within the <br /> currently authorized semi-annual groundwater monitoring budget and therefore no additional <br /> budget is included for these activities herein. However, the scope is discussed above to inform the <br /> County about the additional analytical costs that should be expected because the analytical costs are <br /> directly billed to IRC SWDD . <br /> SCHEDULE <br /> FDEP has requested that the County begin implementation of the required activities by 21 <br /> October 2011 . Geosyntec will initiate these activities within two weeks of receipt of notice to <br /> proceed from the County . The final field schedule will be based on subcontractor availability . <br /> We anticipate that the field activities will tentatively be conducted in November and/or <br /> December 2011 . A description of the well installation and dosing activities will be included in <br /> future semi -annual groundwater monitoring report( s) . <br /> BUDGET ESTIMATE <br /> A budget estimate for the scope of work outlined in Phases 1 through 4 of this proposal is <br /> summarized in the following table, and a detailed budget estimate is provided as Exhibit 1 . The <br /> budget estimate presented in this proposal is based on Geosyntec ' s understanding of the project <br /> XR11055\XR11072 <br /> f' nIlf11"we. rs `civrltists innovators <br />