My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-045
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2015 11:15:45 AM
Creation date
10/1/2015 5:10:54 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/05/2013
Control Number
2013-045
Agenda Item Number
8.F.
Entity Name
Geosyntec Consultants
Subject
Cattle Dip Site
Work Order No.6
Continuing Contract Agreement Professional Services
Supplemental fields
SmeadsoftID
11778
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBITS . <br /> Geospte & 6770 South Washington Avenue, Suite 3 <br /> Titusville, Mrids32780 <br /> consultants PH 32t1696SUO <br /> FAX 321 .269.5813 <br /> 1 February 2013 <br /> Mr. Mike. Nixon <br /> Roadway Production Manager <br /> Engineering Division <br /> Indian River County <br /> 180127th Street (Bldg A) <br /> Vero Beach, FL 32960-3388 <br /> Subject: Professional Services Proposal <br /> Site Assessment Activities <br /> Former Cattle Dip Site <br /> 9255 .93nd Street on County Road 510 <br /> Parcel #31392600000002000001.0 <br /> Vero Beach, Florida <br /> Dear Mr. Nixon. <br /> Geosyntec Consultants (Geosyntec) is pleased to submit this fee proposal to Indian River County <br /> (IRC) for professional services associated with the completion of additional site assessment <br /> activities at the referenced Former Cattle Dip site. The site assessment activities are based on the <br /> Florida Department of Environmental Protection' s (FDEP) Review of the Site Assessment <br /> Report Addendum No. 2, which recommended supplemental groundwater assessment activities <br /> to delineate the extent of the arsenic groundwater impacts with the submittal of a Site <br /> Assessment Status Report (SASR). The arsenic groundwater impacts must be delineated to the <br /> FDEP Groundwater Cleanup Target Level of 10 micrograms per liter (pg/L). The proposed . <br /> scope of work for the services anticipated to delineate and monitor the arsenic groundwater <br /> impacts has been broken down into five separate tasks as described below. <br /> Task 1 — Preliminary Activities <br /> Task 1 'includes project management for the entire project, as well as all preliminary activities <br /> associated with securing project costs from subcontractors and updating the Site-Specific Health <br /> and Safety Plan to cover the additional assessment activities. , Specific activities include: <br /> • updating the existing OSHA-required, Site-Specific Health and Safety Plan;. <br /> • scheduling a utility locate, acquiring field equipment (pumps, water quality meters, <br /> calibration solutions, sampling containers, etc.), subcontracting; and <br /> XK13013/=13= DOC <br /> engineers I scientists i innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.