My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-124
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2016 2:08:46 PM
Creation date
10/1/2015 2:38:50 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
05/17/2011
Control Number
2011-124
Agenda Item Number
15.B.2
Entity Name
Geosyntec Consultants Inc.
Subject
Gifford Road Landfill(South) Groundwater Monitoring
Amendment No. 1 to Work Order No.29
Area
Former Gifford Road Landfill
Supplemental fields
SmeadsoftID
9925
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 4 <br /> MARCH 2011 BUDGET ESTIMATE <br /> SOUTH GIFFORD ROAD LANDFILL <br /> PHASE 4 : Semi-Annual Sampling Activities <br /> ITEM BASIS RATE QUANTITY ESTIMATED <br /> BUDGET <br /> A. Professional Services <br /> a. Principal hr $ 195 . 67 0 $0 <br /> b . Associate hr $ 185 .32 2 $ 371 <br /> c. Senior Project Geologist hr $ 163 . 07 4 $ 652 <br /> d. Project Engineer hr $ 129 . 12 0 $0 <br /> e. Engineer hr $ 112 .49 0 $0 <br /> f Senior Staff Geologist hr $ 100 . 16 170 $ 17, 027 <br /> g. Staff Engineer hr $84 .24 0 $ 0 <br /> Subtotal Professional Services $ 189050 <br /> B Technical/Administrative Services <br /> a. Site Manager/Construction Manager hr $98 . 56 170 $ 16,755 <br /> b . Senior Engineering Technician hr $ 73 . 88 0 $0 <br /> c. Designer/GIS hr $ 119 .39 0 $0 <br /> d . Drafter/CADD Operator hr $72 . 79 0 $0 <br /> e . Technical/Administrative Assistant hr $ 81 . 39 0 $0 <br /> f Technical Word Processor hr $83 . 08 0 $0 <br /> g . Clerical hr $49 . 96 0 $0 <br /> h . Clerical hr $42 0 $0 <br /> Subtotal Technical/Administrative Services $ 16,755 <br /> C. Reimbursables ° <br /> a. Lodging day $ 89 7 $623 <br /> b. Per Diem day $51 14 $714 <br /> c. Communications Fee 3 % labor 0 . 03 $345805 $ 1 ,044 <br /> d. CADD Computer System lir $ 15 0 $ 0 <br /> e . Vehicle Rental day $75 7 $ 525 <br /> f 8 . 5 "xIV Photocopies each $0 . 12 100 $ 12 <br /> g . Overnight Cooler each $95 2 $ 190 <br /> h . Groundwater Sampling Kit day $275 7 $ 15925 <br /> i . Water Level Measurement Kit day $ 53 . 75 2 $ 108 <br /> j . Equipment Shipping each $ 54 2 $ 108 <br /> Subtotal Reimbursables $59249 <br /> TOTAL ESTIMATED'BUDGET : PHASE 4 $40,054 <br /> TOTAL ESTIMATED BUDGET PER EVENT - $209027 <br /> Notes : <br /> 1 . Lodging and per diem rates were taken from the GSA website for the Vero Beach area (www . gsa. gov) . <br /> 2 . Groundwater Sampling Kit includes : water level indicator, oil/water probe, peristaltic or bladder pump, <br /> multi-meter (pH , temperature, conductivity, turbidity, dissolved oxygen, and oxidation reduction potential), <br /> tubing, and miscellaneous supplies . <br /> 3 . Water Level Measurement Kit includes : water level indicator and miscellaneous field supplies . <br /> XR11016.xlsx Geosyntec Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.