My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-231
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:18:08 PM
Creation date
10/1/2015 4:52:08 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E. <br /> 5 December 2012 <br /> Page 3 <br /> Each of these phases is briefly described below. <br /> Phase 1 : General Consultina/Meeting Support/Proiect Management <br /> Phase 1 consists of three components : general consulting, meeting support, and project <br /> management . Geosyntec will provide SWDD with consulting services necessary to initiate the <br /> project. Geosyntec will prepare presentationgraphics, engineering drawings, and other <br /> documents required to support the Project' s meetings and coordination activities . <br /> Project management activities will include . budget and schedule tracking, invoice review, and <br /> project communications, including the preparation of a monthly progress report. The project <br /> report will include a description of the activities completed during the month and planned <br /> activities for the following month . In addition, the progress report will identify any technical or <br /> administrative issues that require SWDD ' s attention and the current status of the budget and <br /> schedule. <br /> Phase 2 : Installation of Remaining Groundwater Monitoring Well Cluster <br /> The remaining groundwater monitoring well cluster, MW-44, will be installed prior to <br /> certification of construction completion and approval of Cell 1 by FDEP for waste placement. <br /> Geosyntec has solicited a quote from Environmental Drilling Service , Inc . (EDS) to serve as a <br /> drilling subcontractor to perform these services . It should be noted that EDS installed the <br /> previous wells as part of the Phase 1 construction contract. A copy of EDS ' proposal is included <br /> as Attachment A . Geosyntec has also solicited a 'quote from Peavey & Associates (Peavey) to <br /> survey the locations of the new groundwater monitoring wells and prepare the required drawing <br /> for submittal to FDEP . Peavey also provided similar services during the Phase 1 construction <br /> project and is currently being used by the Phase 2 construction contractor to provide surveying <br /> services for Cell 1 construction . A copy of Peavey ' s proposal is enclosed as Attachment B . <br /> A Geosyntec ' s hydrogeologist or geotechnical engineer will be on-site to supervise the work. <br /> Upon completion of the well installation, Geosyntec will develop the wells for sampling . The <br /> locations of the wells will be surveyed and a well completion report will be prepared <br /> and <br /> submitted to FDEP in accordance with the requirements of the Monitoring Plan Implementation <br /> Schedule (MPIS) . It has been assumed that the laboratory analyses will be performed by <br /> SWDD ' s contracted analytical laboratory and has therefore not been included in the budget <br /> estimate . <br /> NCP2012\XL 12289UL 12097 <br /> i <br /> engineers 1 scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.