My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-231
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 2:18:08 PM
Creation date
10/1/2015 4:52:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/18/2012
Control Number
2012-231
Agenda Item Number
15.B.2
Entity Name
Geosyntec Consultants Inc.
Subject
Work Order No.6
Landfill Expansion Project
Class I Landfill
Area
Indian River County Landfill Facility
Supplemental fields
SmeadsoftID
11645
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu Mehta, P. E . <br /> 5 December 2012 <br /> Page 4 <br /> Phase 3 : Construction Support Services <br /> Geosyntec will provide construction support services associated with construction of the <br /> modifications to the access road ditch, including the following tasks : (i) Quality Assurance and <br /> Quality Control (QA/QC) services; and (ii) construction management (CM) and engineering <br /> support services. <br /> Geosyntec will provide QA/QC services during construction of the Project. QA/QC monitoring, <br /> testing methods, test frequencies, and reporting requirements will be performed in accordance <br /> with the CQA Plan, Technical Specifications, and applicable portions of Chapter 62=701 , F .A . C . <br /> The work will be executed by a CQA Site Manager with support from the office managerial staff . <br /> as necessary . Geosyntec has assumed a 2-week construction schedule for the ditch modification <br /> project; however, the CQA Site Manager will be on site for a total of 6 days of the <br /> 10-day <br /> construction schedule out of the 10 -day work schedule . Geosyntec will therefore coordinate with <br /> the Contractor' s construction crew to provide monitoring and testing services for the critical <br /> components of the construction project. <br /> Geosyntec will also provide CM and engineering support services throughout the duration of the <br /> ditch modification . CM activities will include assisting the contractor in identifying critical <br /> construction tasks and material procurement activities . Geosyntec will also evaluate Contractor <br /> payment requests, verify quantities and conformance with the plans and specifications, and <br /> provide contract administration . <br /> Phase 4 : Miscellaneous Enaineerina Support Services <br /> During the last construction progress meeting, John Hartings of Republic Services, Inc . (RSI) , <br /> the Class I landfill operator, requested waste grading drawings to delineate the limits of waste <br /> placement in Cell 1 . Geosyntec will utilize the permit drawings to prepare waste grading plan, <br /> cross sections and details showing the limits of waste placement in Cell 1 . Hard and electronic <br /> (in AutoCAD format) copies will be provided to RSI with hard copies to SWDD . <br /> SCHEDULE <br /> Geosyntec schedule is based on the assumption that the current Phase 2 construction contract <br /> including delays and change orders should be completed by mid-January 2013 . Therefore, the <br /> modifications to the access road ditch would be completed during this period . Installation of the <br /> remaining groundwater monitoring well cluster will be completed in January and prior to <br /> completion of the Cell 1 certification report and approval by FDEP . Thus, Cell 1 of the Segment <br /> 3 Expansion should be ready to accept waste in February 2013 . The waste grading drawings will <br /> be submitted to SWDD and RSI prior to FDEP approval of the certification report. <br /> NCP2012U{L12289UL12097 <br /> engineers 1 scientists f innovators <br />