My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-228
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-228
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2015 12:19:14 PM
Creation date
10/1/2015 5:44:56 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
11/12/2013
Control Number
2013-228
Agenda Item Number
15.B.5
Entity Name
Geosyntec Consultants Inc.
Subject
Work Order No.8 Class 1 Landfill
Area
Indian River County Landfill Facility
Supplemental fields
SmeadsoftID
12606
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec ' 1507 20th Street, Suite 201 <br /> Vero Beach, Florida 32960 <br /> PH 772.564 .8717 <br /> consultants FAx 772.564 .8719 <br /> www.geosyntec.com <br /> Mr. Himanshu Mehta, P .E . 17 October 2013 <br /> Managing Director <br /> Solid Waste Disposal District <br /> Indian River County <br /> 1325 74th Avenue SW <br /> Vero Beach, Florida 32968 <br /> Subject: Proposal to Provide Construction Quality Assurance Services <br /> Class I Landfill — Indian River County Landfill Facility <br /> Vero Beach, Indian River County, Florida <br /> Dear Mr. Mehta : <br /> Geosyntec Consultants (Geosyntec) is pleased to submit this proposal to the Indian River County <br /> (IRC) Solid Waste Disposal District (SWDD) to provide Construction Quality Assurance (CQA) <br /> services for the Class I Landfill at the IRC Landfill (IRCL) facility located in Vero Beach, Indian <br /> River County , Florida. The proposal presents the scope of work, schedule, and budget estimate <br /> to provide CQA services at the Class I Landfill . The proposal was prepared in response to a <br /> request from Mr. Himanshu Mehta P .E . , Managing Director of SWDD , to Dr. Kwasi Badu- <br /> Tweneboah, P .E . of Geosyntec in an email dated 19 September 2013 . Geosyntec has prepared <br /> this proposal as Exhibit 1 of Work Order No . 8 for the Continuing Contract Agreement for <br /> Professional Services between IRC SWDD and Geosyntec, dated 15 November 2011 . <br /> The remainder of this proposal presents : (i) project background ; (ii) proposed scope of work ; <br /> (iii) schedule ; and (iv) budget estimate . <br /> PROJECT BACKGROUND <br /> The Phase 2 construction of Cell 1 of Segment 3 Expansion (Phase 2 project) began on May 21 , <br /> 2012 and was substantially completed on February 6, 2013 . The Phase 2 project was approved <br /> for waste acceptance by the Florida Department of Environmental Protection (FDEP) on April 5 , <br /> 2013 . Geosyntec provided CQA activities for the Phase 2 project. <br /> As a part of the Phase 2 project, an east-west temporary diversion berm and a rain flap were <br /> constructed to divide Cell 1 into approximately two halves in order to separate the landfilling and <br /> leachate in the northern half of the cell from stormwater in the southern half of the cell . A pump <br /> was installed at the low point in the southern half to pump out the collected stormwater to the <br /> perimeter drainage channel . <br /> JL130791JL13079_Proposal for CQA Services <br /> engineers I scientists I innovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.