My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-164
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-164
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2016 4:19:59 PM
Creation date
10/1/2015 2:20:30 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
07/06/2010
Control Number
2010-164
Agenda Item Number
15.B.2
Entity Name
Geosyntec
Subject
South Gifford Road Landfill Groundwater monitoring
Work Order 29
Supplemental fields
SmeadsoftID
9727
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3 <br /> BUDGET ESTIMATE <br /> ONE YEAR OF GROUNDWATER MONITORING AND REPORTING <br /> SOUTH GIFFORD ROAD LANDFILL <br /> PHASE 3 : Field Activities <br /> ESTIMATED <br /> ITEM BASIS RATE QUANTITY <br /> BUDGET <br /> Professional Services <br /> a. Principal hr $ 195 . 67 0 $ 0 <br /> b . Associate hr $ 185 . 32 2 $371 <br /> c . Senior Project Geologist hr $ 165 . 07 4 $660 <br /> d. Project Engineer hr $ 129 . 12 0 $ 0 <br /> e . Engineer hr $ 112 .49 0 $0 <br /> f. Senior Staff Geologist hr $ 100 . 16 110 $ 11 ,018 <br /> g . Staff Engineer hr $84 .24 0 $0 <br /> Subtotal Professional Services $ 12,049 <br /> B. Tecbuical/Adrd nistrative Services <br /> �,. �.. Aw <br /> a. Site Manager/Construction Manager hr $98 . 56 110 $ 105842 <br /> b . Senior Engineering Technician hr $73 . 88 0 $0 <br /> c. Designer/GIS hr $ 119 . 39 0 $ 0 <br /> d . Drafter/CADD Operator hr $ 72 . 79 0 $0 <br /> e . Technical/Administrative Assistant ' hr $ 81 . 39 0 $0 <br /> f Technical Word Processor hr $ 83 . 08 0 $ 0 <br /> g . Clerical hr $49 .96 0 $0 <br /> h . Clerical hr $42 0 $ 0 <br /> Subtotal Technical/Administrative Services $ 109842 <br /> C." Reimbui�sables ' <br /> a. Lodging day $ 89 10 $ 890 <br /> b. Per Diem day $ 51 20 $ 15020 <br /> c . Communications Fee 3 % labor 0 . 03 $225890 $687 <br /> d. CADD Computer System hr $ 15 0 $0 <br /> e . Vehicle Rental day $75 10 $ 750 <br /> f. 8 . 5 "x11 " Photocopies each $0 . 12 100 1 $ 12 <br /> g. Overnight Cooler each $95 2 $ 190 <br /> h . Groundwater Sampling Kit day $275 10 $23750 <br /> i . Water Level Measurement Kit day $ 53 . 75 2 $ 108 <br /> j . Equipment Shipping each $ 54 2 $ 108 <br /> Subtotal Reimbursables $65514 <br /> e TOTAL ESTIMATED, BUDGET : PHASE+3 ' $29,404 • 1��; . t ' TOTAL ESTIMATED BUDGET PEItEVEN <br /> $14,702` �". E ' <br /> Notes : <br /> 1 . Groundwater Sampling Kit includes : water level indicator, oil/water probe, peristaltic or bladder pump, <br /> multi-meter (pH , temperature, conductivity, turbidity, dissolved oxygen, and oxidation reduction potential ), <br /> tubing, and miscellaneous supplies . <br /> 2 . Water Level Measurement Kit includes : water level indicator and miscellaneous field supplies. <br /> XR07014/XR10016rev.xlsx Geosyntee Consultants <br />
The URL can be used to link to this page
Your browser does not support the video tag.