Laserfiche WebLink
Mr . Himanshu Mehta, P . E . Managing Director <br /> 3 November 2011 <br /> Page 2 <br /> This landfill facility is currently operating under Title V Air Operation Permit No . 0610015 - 003 - <br /> AV , effective July 19 , 2007 . The existing Class I Landfill has a voluntarily- installed gas <br /> collection and control system (GCCS ) for those areas at final grades . Segment 1 , Segment 2 , and <br /> the Infill Area of the IRCL have an existing GCCS that consists of vertical and horizontal gas <br /> extraction wells , gas collection lateral and header pipes, blower, and flare . Collected landfill gas <br /> is piped to a flare/blower system , located immediately east of Segment 2 , where the combustible <br /> components are oxidized by incineration . SWDD has recently entered into an agreement for the <br /> sale of the landfill gas to an adjacent waste4o- ethanol facility , presently under construction , for <br /> use as a supplemental fuel for the process . <br /> Geosyntec also understands that the IRCL facility is currently regulated under the New Source <br /> Performance Standards (NSPS ) for municipal solid waste ( MSW) landfills as identified in <br /> Subpart WWW of 40 CFR, Part 60 ( Subpart WWW) . An NSPS Tier 2 NMOC emissions rate <br /> report was prepared and submitted to FDEP as part of the Title V renewal permit application in <br /> January 2007 . A similar Tier 2 testing will be performed to estimate the site - specific NMOC <br /> concentration to recalculate and submit a Tier 2 NMOC emission rate report as part of this 2011 <br /> Title V renewal permit application . <br /> PROPOSED SCOPE OF WORK <br /> This project includes professional engineering services required to renew the Title V Air <br /> Operation Permit for the IRCL facility . The scope of work is based on the requirements of <br /> Chapter 403 , Florida Statue ( F . S .) , Florida Administrative Code (F . A . C .) Chapters 624 , 62-210 <br /> and 62 -213 ) , and Geosyntec ' s understanding of the project based on information provided by <br /> SWDD . Geosyntec will provide all engineering services necessary to prepare the 5 - year renewal <br /> permit application , including sampling and testing the landfill gas to calculate the NMOC , and <br /> address any request for additional information ( RAI ) from FDEP . <br /> For budgeting purposes , the scope of work will be performed in four phases as follows : <br /> • Phase 1 — General Consulting/Meeting Support/ Project Management ; <br /> • Phase 2 — Tier 2 Testing and Reporting ; <br /> • Phase 3 — Title V Renewal Permit Application ; and <br /> • Phase 4 — Response to Regulatory Comments . <br /> Each of these phases is briefly described below . <br /> NCP201IAL11275UL1 1126 Title V Proposal . doc <br /> enI lteryrs ( ti : ixl � titti I innovators <br />