My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-168
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-168
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2015 11:09:11 AM
Creation date
10/1/2015 5:33:11 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
09/10/2013
Control Number
2013-168
Agenda Item Number
8.H.
Entity Name
GFA International
Subject
Work OrderNo. GFA-3 Construction Testing Services
Area
PC South Algal Nutrient Removal Facility
Supplemental fields
SmeadsoftID
12241
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P. C. South Algal Nutrient Removal Facility <br /> 1225 SW 5th Street <br /> Vero Beach, FL <br /> Indian River County Page 2 of 7 <br /> Proposal No. 13- 143 7. 00 <br /> Laboratory soil testing will be required to identify the properties and suitability of the <br /> soil to be used at the site . Proctor tests will be required to obtain material ' s maximum <br /> density and optimum moisture content , which would be used to verify that the degree <br /> of compaction in the field is achieved . <br /> 1 . 2 Field Density/Moisture Testing <br /> GFA will provide a field technician to test the in - place density of the compacted fills . <br /> For this testing , GFA will use the Nuclear Method (ASTM D2922 ) in the field , which will <br /> be correlated with the corresponding laboratory proctor compaction tests . <br /> 1 . 3 Cast- in - Place Concrete <br /> GFA will provide an ACI - certified technician to test the concrete delivered to the site . In <br /> accordance with the project specifications , the technician will mold a set of five <br /> compression cylinders per ASTM C - 31 for every 50 cubic yards or fraction thereof <br /> placed per day . GFA will also determine the slump and temperature of the concrete <br /> each time a set of cylinders are cast <br /> The cylinders will be cured in the laboratory , with one cylinder tested at seven days <br /> and three at 28 days . GFA can also assist in evaluating mix submittals and provide <br /> laboratory verifications , if necessary , although fees for this service are not included <br /> herein . <br /> 1 . 4 Schedule of Fees <br /> The actual cost of our services will be highly dependent on the construction schedule . <br /> As we have not been provided with a precise construction schedule , it is not possible <br /> to make a precise estimate of the manpower and testing requirements . Therefore , <br /> GFA proposes to provide its services on a unit cost basis ; based on the actual work <br /> performed and the unit fees shown on the attached Schedule of Fees . For your budget <br /> purposes , GFA has estimated quantities for these services based upon the anticipated <br /> scope of work . <br /> The unit rates and/or hourly rates do not include any overtime work . Overtime work <br /> (scheduled for before 7 : 00 AM or going past 4 : 00 PM Monday through Friday , more <br /> than 8 hours in one day , more than 40 hours in one week , or anytime on Saturdays , <br /> Sundays , or Holidays) , will be charged at the standard rate times 1 . 5 . Technician Time <br /> will be charged in the event that the Contractor' s work is not ready for <br /> testing /inspection upon arrival of GFA' s representative , or if our minimum testing <br /> frequencies specified herein cannot be achieved . <br />
The URL can be used to link to this page
Your browser does not support the video tag.