My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-113
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-113
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 2:25:27 PM
Creation date
10/1/2015 4:30:21 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
06/19/2012
Control Number
2012-113
Agenda Item Number
8.D.
Entity Name
GFA International, Inc.
Subject
Oslo Roadway Improvements Phase 111
Work Order No. 2
Area
43rd Ave. to 58th Ave.
Project Number
0517
Supplemental fields
SmeadsoftID
11258
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l2r�RNA'ClO�Av <br /> May 25 , 2012 <br /> Aruna Wera oda , P . E . <br /> Indian River County <br /> 1801 27th Street , Building A <br /> Vero Beach , Florida 32960 -3388 <br /> Email : aweragoda (cDircgov . com <br /> Re : Oslo Road , Phase III Roadway Improvements <br /> Indian River County , Florida <br /> Proposal No . 12 -0982 . 01 <br /> Ladies and Gentlemen : <br /> A . M . Engineering and Testing , Inc . is pleased to submit the following estimate of the soil and <br /> concrete testing costs for the referenced project . The estimate is based on FDOT 2010 Standard <br /> Edition , our unit prices , our interpretation of the project specifications , and our experience on <br /> similar type projects . The actual testing costs could vary depending on site conditions , <br /> construction schedules , or engineer requirements . You would only be invoiced for work <br /> performed . <br /> PAVEMENT AREA SOILS (Minimum of three test per trip .) <br /> TEST QUANTITY UNIT PRICE AMOUNT <br /> Base Density ( 2 Lift ) 84 20 11680 <br /> Subgrade Density 62 20 17240 <br /> Curb Pad Density 62 20 1 , 240 <br /> Stabilized Subgrade Limerock 26 250 61500 <br /> Bearing Ratio ( LBR ) <br /> Sidewalk & Shoulder Density 32 20 640 <br /> Embankment Density 230 20 41600 <br /> Technician Time 56 45 21520 <br /> $ 18 , 420 <br /> UNDERGROUND UTILITIES STORM DRAINAGE BELOW PAVEMENT (Minimum of three test per trip .) <br /> TEST QUANTITY UNIT PRICE AMOUNT <br /> Storm Drain Backfill Density 770 20 15 , 400 <br /> Technician Time 68 45 31060 <br /> $ 18 , 460 <br />
The URL can be used to link to this page
Your browser does not support the video tag.