My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-254A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-254A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2015 11:55:48 AM
Creation date
10/1/2015 5:53:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/10/2013
Control Number
2013-254A
Agenda Item Number
8.N.
Entity Name
Summit Construction of Vero Beach LLC
Subject
Gifford Park Ballfields Grading Improvements
Contract and Specifications
Area
Gifford Park
Project Number
1336
Bid Number
2014015
Supplemental fields
SmeadsoftID
12779
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
perform any of the Work , or anyone for whose acts Documents , CONTRACTOR shall do all cutting , <br /> any of them may be liable , the indemnification fitting , and patching of the Work that may be required <br /> obligation under paragraph 6 . 20 . A shall not be limited to properly connect or otherwise make its several <br /> in any way by any limitation on the amount or type of parts come together and properly integrate with <br /> such <br /> damages , compensation , or benefits payable by or for other work. CONTRACTOR shall not endanger any <br /> CONTRACTOR or any such Subcontractor, Supplier, work of others by cutting , excavating , or otherwise <br /> or other individual or entity under workers' compen- altering their work and will only cut or alter <br /> their work <br /> sation acts , disability benefit acts , or other employee with the written consent of ENGINEER and the others <br /> benefit acts . whose work will be affected . The duties and <br /> responsibilities of CONTRACTOR under this <br /> C . The indemnification obligations of CON - paragraph are for the benefit of such utility owners and <br /> TRACTOR under paragraph 6 . 20 . A shall not extend to other contractors to the extent that there are <br /> the liability of ENGINEER and ENGINEER's comparable provisions for the benefit of <br /> Consultants or to the officers, directors , partners , CONTRACTOR in said direct contracts between <br /> employees , agents , and other consultants and OWNER and such utility owners and other <br /> subcontractors of each and any of them arising out of: contractors . <br /> 1 . the preparation or approval of, or the Co If the proper execution or results of any part of <br /> failure to prepare or approve , maps , Drawings , CONTRACTOR ' s Work depends upon work per. <br /> opinions , reports , surveys, Change Orders , formed by others under this Article 7 , CONTRACTOR <br /> designs , or Specifications ; or shall inspect such other work and promptly report to <br /> ENGINEER in writing any delays , defects , or deficien - <br /> 2 . giving directions or instructions , or cies in such other work that render it unavailable or <br /> failing to give them , if that is the primary cause unsuitable for the proper execution and results of <br /> of the injury or damage . CONTRACTOR's Work. CONTRACTOR 's failure to <br /> so report will constitute an acceptance of such other <br /> work as fit and proper for integration with <br /> ARTICLE 7 - OTHER WORK CONTRACTOR 's Work except for latent defects and <br /> deficiencies in such other work . <br /> 7 . 01 Related Work at Site 7 . 02 Coordination <br /> A. OWNER may perform other work related to A. If OWNER intends to contract with others for <br /> the Project at the Site by OWNER's employees , or let the performance of other work on the Project at <br /> the <br /> other direct contracts therefor, or have other work Site , the following will be set forth in <br /> Supplementary <br /> performed by utility owners . If such other work is not Conditions : <br /> noted in the Contract Documents , then : <br /> 1 . the individual or entity who will have <br /> 1 . written notice thereof will be given to authority and responsibility for coordination of <br /> CONTRACTOR prior to starting any such other the activities among the various contractors will <br /> work; and be identified ; <br /> 2 . if OWNER and CONTRACTOR are 2 , the specific matters to be covered by <br /> unable to agree on entitlement to or on the such authority and responsibility will be <br /> amount or extent, if any, of any adjustment in itemized ; and <br /> the Contract Price or Contract Times that <br /> should be allowed as a result of such other 3 , the extent of such authority and <br /> work, a Claim may be made therefor as responsibilities will be provided . <br /> provided in paragraph 10 . 05 . <br /> B . Unless otherwise provided in the <br /> B . CONTRACTOR shall afford each other Supplementary Conditions , OWNER shall have sole <br /> contractor who is a party to such a direct contract and authority and responsibility for such coordination . <br /> each utility owner (and OWNER , if OWNER is per- <br /> forming the other work with OWNER ' s employees) <br /> proper and safe access to the Site and a reasonable <br /> opportunity for the introduction and storage of <br /> materials and equipment and the execution of such <br /> other work and shall properly coordinate the Work with <br /> theirs . Unless otherwise provided in the Contract <br /> 00700 - General Conditions REV 5-10-13.doc <br /> 00700 - 26 <br /> F1Public Works\ENGINEERING DIVISION PROJECTS\1336-Gifford Senior BallfieldWdmin\bid documents\MasterContract\Contract Documents\00700 - General Conditions REV <br />5-10- <br /> 13. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.