My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-254A
CBCC
>
Official Documents
>
2010's
>
2013
>
2013-254A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2015 11:55:48 AM
Creation date
10/1/2015 5:53:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/10/2013
Control Number
2013-254A
Agenda Item Number
8.N.
Entity Name
Summit Construction of Vero Beach LLC
Subject
Gifford Park Ballfields Grading Improvements
Contract and Specifications
Area
Gifford Park
Project Number
1336
Bid Number
2014015
Supplemental fields
SmeadsoftID
12779
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Addendum #1 11 -06-2013 <br /> M . Execution <br /> 1 . Sprigging operation will not be permitted until the soil is moist and in proper condition <br /> to induce growth . No sprigging shall be done when the ground is below 40 ° <br /> F . , unduly wet , or otherwise not in suitable condition . <br /> 2 . Install sprigs at prescribed plant rate . Water immediately after planting and keep soil <br /> moist for 3 to 5 weeks . One week after planting apply 250 pounds ammonium nitrate <br /> per acre . Apply when grass blades are dry . Follow up by watering to prevent <br /> burning . <br /> 3 . Contractor shall be responsible for maintaining the fields during the growing in <br /> process of the grass . <br /> a . Watering : <br /> Newly-sprigged areas are to be watered by the Contractor as necessary to <br /> keep sprigs alive . Dead sprigs shall be replaced prior to Owners acceptance . <br /> b . Rolling : <br /> Immediately after completion of sprigging , the entire grassed area shall be <br /> rolled thoroughly with the appropriate equipment . At least two trips over the <br /> entire area will be required . <br /> c . Operations on steep slopes : <br /> Do not place sprigs on steep sloped areas . All slopes and retention areas to <br /> be sodded as specified on the Engineers plans . <br /> Item of Payment <br /> Payment shall be made under: <br /> Bid Item No . 11 — Certified Celebration Bermuda ( Sprigs ) Applied at a rate of 1300 <br /> bushels per acre - Per Lump Sum <br /> Bid Item No . 12 - Performance Turf ( sod ) ( Bahia ) — Per Square Yard . <br /> SECTION - 13 — IRRIGATION <br /> Description : <br /> Football Field : Contractor to extend existing system to provide 100 % coverage of <br /> fenced in area . <br /> Senior Softball Field : Contract to tie into existing irrigation system at the well and <br /> install an irrigation system that will provide 100 % coverage of all grassed area <br /> within the fence line . <br /> Little League Field : Contractor to adjust existing irrigation system to new grades <br /> and upgrade irrigation system as needed , to provide 100 % coverage of all grassed <br /> area within the fence line . <br /> 01025-25 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1336-Gifford Senior Ballfield\Admin\bid documents\ADDENDUMS\Technical <br /> Specificabons.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.