Laserfiche WebLink
Addendum #1 11 -06-2013 <br /> M . Execution <br /> 1 . Sprigging operation will not be permitted until the soil is moist and in proper condition <br /> to induce growth . No sprigging shall be done when the ground is below 40 ° <br /> F . , unduly wet , or otherwise not in suitable condition . <br /> 2 . Install sprigs at prescribed plant rate . Water immediately after planting and keep soil <br /> moist for 3 to 5 weeks . One week after planting apply 250 pounds ammonium nitrate <br /> per acre . Apply when grass blades are dry . Follow up by watering to prevent <br /> burning . <br /> 3 . Contractor shall be responsible for maintaining the fields during the growing in <br /> process of the grass . <br /> a . Watering : <br /> Newly-sprigged areas are to be watered by the Contractor as necessary to <br /> keep sprigs alive . Dead sprigs shall be replaced prior to Owners acceptance . <br /> b . Rolling : <br /> Immediately after completion of sprigging , the entire grassed area shall be <br /> rolled thoroughly with the appropriate equipment . At least two trips over the <br /> entire area will be required . <br /> c . Operations on steep slopes : <br /> Do not place sprigs on steep sloped areas . All slopes and retention areas to <br /> be sodded as specified on the Engineers plans . <br /> Item of Payment <br /> Payment shall be made under: <br /> Bid Item No . 11 — Certified Celebration Bermuda ( Sprigs ) Applied at a rate of 1300 <br /> bushels per acre - Per Lump Sum <br /> Bid Item No . 12 - Performance Turf ( sod ) ( Bahia ) — Per Square Yard . <br /> SECTION - 13 — IRRIGATION <br /> Description : <br /> Football Field : Contractor to extend existing system to provide 100 % coverage of <br /> fenced in area . <br /> Senior Softball Field : Contract to tie into existing irrigation system at the well and <br /> install an irrigation system that will provide 100 % coverage of all grassed area <br /> within the fence line . <br /> Little League Field : Contractor to adjust existing irrigation system to new grades <br /> and upgrade irrigation system as needed , to provide 100 % coverage of all grassed <br /> area within the fence line . <br /> 01025-25 Technical Specifications <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1336-Gifford Senior Ballfield\Admin\bid documents\ADDENDUMS\Technical <br /> Specificabons.doc <br />