Laserfiche WebLink
Addendum #1 11 -M2013 <br /> PART 3 - EXECUTION <br /> A . Design , construct , and maintain the pollution control and treatment system to <br /> minimize erosion and capture and remove pollutants from the construction site and <br /> from all other areas disturbed by construction activities . <br /> Be Apply polyacrylamide only as directed by the polyacrylamide manufacturer/supplier. <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 2 — Erosion & Water Pollution Control - Lump Sum <br /> [The remainder of this page was left blank intentionally] <br /> 01025-8 Technical Specifications <br /> R\Public Works\ENGINEERING DIVISION PROJECTS\1336=Gifford Senior Ballfield\Admin\bid documentsWDDENDUMS\Technical <br /> Sncrifirafinnc rinr <br />